06/10/2024
We’re all over the place lately ! From one project to the next all the machines are currently working.
Moved the SK170 to Plymouth to get started on a new project involving two additions and a new garage across the street. Installing erosion control, cutting trees, removing stumps, stripping loam, hammering a large rock, removing a precast block wall, removing a deck pier, fighting some ground water and blasted ledge, all three holes are ready for concrete. As well as the driveway expanded, graded and erosion stone ditch laid to control water run off.
The SK150 finished up one lot for now, after wrapping up excavating and backfilling conduit. Then moved across town to another lot to excavate and back fill the waterline with clean sand, spread raw loam in the back yard and handle some extra rocks laying around on site. With some help from the skid steer, 3/4” stone was installed as a drip edge around the house, a propane tank pad as well as under the decks. This lot is finally starting to come together.
We also regraded a campsite with 3/4” stone making for a nice and clean look.
Also Installed some deck piers on one lot. And hitting a couple test pits in between.
Give me a call with your site work needs! Offering many services from small jobs to big projects!