11/26/2024
Studio apartment is just about done, waiting on flooring, cabinets for kitchen and tiles for bathroom and shower area.
Meanwhile outside I had to install a storm drain for apt #2 to stop major flooding in the driveway.
AC/ heat unit has been installed and just in time for this winter cold.
Objective is to finish up studio apartment, and then go back to the 2 bedroom apartment.
Stay tuned for updates as I can, you’re not gonna believe the final reviel.
GBMRENOVATIONS , one man on a mission!