06/04/2026
A multifamily residential building was occupied and in active use β but its timber pile foundation was failing from fungal deterioration. Conventional pile replacement was not feasible. The building could not be vacated.
URETEK rehabilitated the piles in place: fungal inhibitor treatment, void infiltration, and urea-silicate encapsulation at every identified pile. A 4-phase in-place solution that saved the foundation without displacing a single resident.
π Download the full case study: https://drive.google.com/file/d/17g8_7mvX4toVouqDdVl-RIVPy_qtQCMA/view?usp=sharing