AGC Construction

Call Directions Contact the business

AGC Construction Locally owned and operated General Contracting company here to help our community licensed bonded and insured. We work on commercial and residential projects

10/28/2026

Just a joke! I would never.

10/26/2026

its a process for a reason but the best bet is to trust the contractor with actual experience. Like us. We've been doing this for 12 years and we've seen it all.

10/23/2026

excitement might not be the most accurate way to describe how it feels but it definitely gets the heart rate up

10/21/2026

someone say we could get out early today?

10/19/2026

even a broken clock is right two times a day

10/16/2026

short day, what even is that?

10/09/2026

Day one of this backyard, and nothing's going up yet. About a week of demo before the steel porch and patio can even start — old material out, ground cleared, everything reset so what gets built sits on something solid. Homeowners always underestimate this stage because there's nothing to look at. A decade in this trade and it's the part we won't rush. Build on a bad base and you'll see it in the posts, the drainage, and the way it holds up a few years in. Right now it looks like a mess. Follow for the glow up

10/07/2026

If nobody told you to insulate your metal building, they were making the bid look cheaper. Bare steel in Tucson turns into an oven — it pulls heat in all day and holds it, so inside ends up hotter than outside. Then winter hits and it's the opposite problem, because there's nothing in those walls to keep anything in. Years of building steel structures here, and we've watched plenty of people realize this in July, after it's framed and skinned and the fix costs real money. Insulation isn't the upgrade. It's the difference between a building you can use and a building you can only store things in.

10/05/2026

Nobody posts the demo and excavation stage, but it decides how the whole patio turns out. Before anything gets built, the old surface comes out, the ground gets dug to depth, and the grade gets set so water runs away from the house instead of toward it. A decades in this trade and we've seen what happens when a crew skips this part to get to the fun stuff — settling, cracking, standing water after the first real monsoon. The patio you'll see in a few weeks is already being decided right here.

10/03/2026

This only works if you already know what you're doing.

Address

Tucson, AZ

Opening Hours

Monday 7am - 5pm
Tuesday 7am - 5pm
Wednesday 7am - 5pm
Thursday 7am - 5pm
Friday 7am - 5pm

Telephone

+15204297919

Website

Alerts

Be the first to know and let us send you an email when AGC Construction posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to AGC Construction:

Shortcuts

Share