11/02/2019
Our sign is up over the new 18’ x 12 ‘ engine dock door!The perfect spot to load and unload as the concrete holds the weight better than asphalt, especially since the engine crane is on that end of the building. The repair facility begins at the door on the right with stairs and runs to my white truck to the far left in front of the offices inside the gated area. Special thanks to Mr. Kuhn & Signs once again!