04/03/2026

Moving in to start the new boat dock and sea wall for one awesome customer…..

04/03/2026
WCC CONSTRUCTION DID IT - 10-20-2025 to 02-11-2026. 2760 sq ft. and we finally cleaned today. Thank you to some amazing ...
11/02/2026

WCC CONSTRUCTION DID IT - 10-20-2025 to 02-11-2026. 2760 sq ft. and we finally cleaned today. Thank you to some amazing subs and my core crew.

When you show up to complete the trim work, and the GC leaves it like this ……. WIN WIN
28/01/2026

When you show up to complete the trim work, and the GC leaves it like this ……. WIN WIN

Trash out. Winterize. Clean. WCC doesn’t do just remodels, add ons or new builds. Let us know what you need.
22/01/2026

Trash out. Winterize. Clean. WCC doesn’t do just remodels, add ons or new builds. Let us know what you need.

A little day job for a very special customer. His son called to say his dad was going to have a heat stroke while grilli...
15/01/2026

A little day job for a very special customer. His son called to say his dad was going to have a heat stroke while grilling. Well, we fixed that. Just waiting on metal for roof, and gutters.

From start to move in, the goal is 5 months on 2,700 sq ft. WCC thinks it will happen. We are almost done with interior ...
15/01/2026

From start to move in, the goal is 5 months on 2,700 sq ft. WCC thinks it will happen. We are almost done with interior painting. Flooring coming, and just finishing. This has been a great job. Give WCC a call if we can help you. Quality at a competitive price. WCC owners actually on site almost every day of construction. Full set of pictures coming soon.

Progress…….
06/01/2026

Progress…….

This has been such a fun build. 6+ months ahead of schedule. This is just a progress post, but to date, remaining items ...
31/12/2025

This has been such a fun build. 6+ months ahead of schedule. This is just a progress post, but to date, remaining items are paint, install of electrical fixtures, plumbing fixtures, and flooring. Master shower is currently being installed and will complete in a day or so. Base will be installed after flooring so there is no need for shoe mold or quarter round. If you are interested in other stages of this project, I have several pictures. Here is what it looked like when we left yesterday.

Progress……Paint almost complete. Considering turf for flat yard. Electrical, plumbing, drainage from the front, flagston...
25/12/2025

Progress……Paint almost complete. Considering turf for flat yard. Electrical, plumbing, drainage from the front, flagstone on the wall and sidewalk, new sprinkler system in back and new perimeter fence. Total transformation and it gets better everyday. This is definitely on our list of favorites. If WCC can be of service to you, please give us a call.

This is where we started…..and just a couple of months in we have demolished the entire back deck and built back larger....
18/12/2025

This is where we started…..and just a couple of months in we have demolished the entire back deck and built back larger. Added a lot of stem wall to level a portion of the yard. New fencing, new railing, flag stone, new sliding door. New paint and opening up walls on the interior, and the list continues. Just a sneak peek at how far we have made it in a short time.

Address

221 Pierce Drive

Alerts

Be the first to know and let us send you an email when WCC Construction Services posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to WCC Construction Services:

  • Want your business to be the top-listed Engineering Company?

Share