06/05/2026
Got the batter boards up so we could pull layout and mark out our footings on our current new construction build.
This is one of the most crucial steps of the whole job. Our concrete has to be within an eighth of an inch in every direction, up, down, left, right, with square corners and dead level. That takes a skilled crew to get right, and it makes all the difference when we go to stand the building up.
Get it right here and everything on top of it goes the way it should. If you've got a build or remodel coming up, give us a call. We'd love to take a look at it.
Virgin River Construction, LLC
435.668.8298
[email protected]