Finished and ready to ride.
This 125’ x 200’ arena was built from the ground up with a major focus on long-term performance, drainage, stability, and consistency throughout the entire riding surface. Every inch of this arena was precision laser leveled to ensure proper water runoff while still maintaining the consistent footing riders and horses need.
A quality arena starts long before the final footing is installed. The foundation and pad preparation are everything. On this project, the base was properly graded, compacted, and built in layers to create a stable platform that will hold up under heavy use and changing weather conditions.
The finished footing was designed to provide:
• Consistent depth across the entire arena
• Proper cushion and support for horses
• Reduced compaction and uneven wear
• Better moisture retention and dust control
• Reliable drainage to minimize standing water and muddy areas
Too many arenas look good for a few weeks, then quickly develop low spots, washouts, soft corners, and inconsistent footing because the groundwork underneath was rushed or skipped. Taking the extra time to properly build and laser level the pad makes all the difference in how an arena performs years down the road.
Proud of how this one turned out. Clean grade work, proper drainage, solid foundation, and a finished riding surface built to last.