06/26/2026
All finished up and ready for trim.In and out 2 day job. We dug the hole cut out the block and installed the frame for the window first day. Second day we flashed and set the window, installed the drainage field, set the egress window well and ladder, backfilled finished grade and placed sod back down. Thanks Wells Remodeling LLC for giving us a call on the egress window install.