Thompson Site Services

Thompson Site Services Excavation, Construction, Demolition

05/08/2026

We’re looking to add members to our property maintenance team!

Looking for steady, year‑round work with a team that values effort, reliability, and craftsmanship? Thompson Site Services is looking to grow our property maintenance crew.

You’ll help with mowing, trimming, cleanup, seasonal work, and general labor at our commercial properties. During the winter months, this role includes snow plowing, snow removal support, and assisting our maple sugaring operations.

We’re looking for someone with reliable transportation, a strong work ethic, and a willingness to learn and take initiative.

Benefits include competitive pay, paid vacation, and a $500.00 sign on bonus after 60 days.

If you’re ready to jump in, work hard, and grow with us, send us a message and let’s talk.

Prep work complete for this upcoming dry hydrant installSite is cleared, excavation is underway, and everything is getti...
05/07/2026

Prep work complete for this upcoming dry hydrant install

Site is cleared, excavation is underway, and everything is getting set up for a smooth installation. Taking the time to do the groundwork right ensures long-term reliability and dependable emergency water access for the residential property.

Looking forward to getting this one finished up.

🚧Project Update From Thompson Site Service🚧Crew that’s a wrap on the Bethel Project, final completions done! Backfilling...
05/04/2026

🚧Project Update From Thompson Site Service🚧

Crew that’s a wrap on the Bethel Project, final completions done!

Backfilling ✅
Final Grading ✅
Topsoil, Seed, Hay✅

🚧Project Update From Thompson Site Service🚧Crew is placing the final touches on Bethel Project completion of phase two. ...
04/27/2026

🚧Project Update From Thompson Site Service🚧

Crew is placing the final touches on Bethel Project completion of phase two.

✅Replacing All Septic Tanks
✅Building New Leach Field
✅Installing New Sewer Main
✅Installing New Water Lines Throughout Property

We’re proud of how this project is wrapping up and the team’s continuous hard work and dedication, final pictures coming soon!

01/01/2026

Have you ever wondered how effective salt really is for winter road treatment? Salt lowers water’s freezing point. When applied, a salt brine is formed and prevents the bonding between snow and ice to the pavement. Around 30°F, one pound of salt can melt 46 pounds of ice, yet at 15 degrees it only melts 6 pounds. Because salt is more effective between 15–30°F, once pavement temperatures dip below about 15°F our crews switch to other materials to best treat roads and keep roads as safe as possible.

🚜 We're Hiring: Operator/Laborer – Join the Thompson Site Services Team! ❄️Thompson Site Services is looking for a hardw...
12/10/2025

🚜 We're Hiring: Operator/Laborer – Join the Thompson Site Services Team! ❄️
Thompson Site Services is looking for a hardworking, reliable Operator/Laborer to join our crew in White River Junction, VT. This is a hands-on role with year-round variety and the chance to grow with a team that takes pride in doing things right.

🌨 Winter Work Includes:
• Snow removal and ice treatment (on-call hours based on storms)
• Long shifts and flexible scheduling required during weather events
🛠 Year-Round Responsibilities:
• Supporting our property maintenance, excavation, and maple sugaring crews
• Operating equipment and assisting with general labor tasks
✅ What We’re Looking For:
• Reliable transportation
• Strong work ethic and team mindset
• Willingness to learn new skills and take initiative
💲 Pay: Competitive and based on experience

If you're ready to work hard, learn fast, and be part of a team that values craftsmanship and commitment, we want to hear from you!

Contact Jason @ (802) 369-5115 for more information.

🚧 Project Update from Thompson Site Services 🚧Crew 2 has officially kicked off their new project in Bethel   Work comple...
11/25/2025

🚧 Project Update from Thompson Site Services 🚧

Crew 2 has officially kicked off their new project in Bethel

Work completed already:
✅ Constructed two new trailer pads
✅ Located all the old septic tanks scheduled for replacement
✅ Repaired a couple of water lines that needed immediate attention

Looking ahead, our team will be:
🔹 Replacing all the septic tanks
🔹 Building a new leach field
🔹 Installing a new sewer main

Phase Two:
🔹 Installing new water lines throughout the property.

We’re proud of the hard work our crew is putting in to make this project a success. Stay tuned for more updates as the site continues to take shape!

Progress Update at Royalton Terrace 🚧This week Crew 1 has been hard at work completing the all-new septic system at Roya...
11/21/2025

Progress Update at Royalton Terrace 🚧

This week Crew 1 has been hard at work completing the all-new septic system at Royalton Terrace. Yesterday marked a major milestone as the final manhole catch basin was set in place. By today, everything will be fully tied into the new leach field, ensuring a modern and reliable system for years to come.

Next up: installation of the brand-new water supply system. This phase will include construction of a new pump house and installation of all new water lines, further strengthening the infrastructure at Royalton Terrace.

We’re proud of the dedication and craftsmanship our crew brings to every project, and excited to see this one moving into its next stage.

Address

180 Dewitt Drive
White River Junction, VT
05001

Alerts

Be the first to know and let us send you an email when Thompson Site Services posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Share