ECO Cladding

Directions Website Contact the business

ECO Cladding ECO Cladding offers a complete aluminum subframe platform of adjustable bracket and rail systems the

With over 25 years of industry relationships, technical expertise, and real-life experience, ECO Cladding offers a complete aluminum subframe platform of adjustable bracket and rail systems to accommodate a wide variety of rainscreen panels. Our approach to rainscreen subframing gives designers the ability to interchange multiple cladding materials on the same elevation and/or project seamlessly with the same substructure components and bracket assembly. From wind load, thermal, and span analysis to panel layout optimization and installation support, ECO Cladding provides a full range of design-assist, engineering, and installation support. Design materials such as ACM, metal panels, FRP, fiber cement, HPL, terracotta, natural stone, porcelain ceramic, and fiber concrete can all be integrated into a drained and back-ventilated (DBV) rainscreen wall assembly with one seamless and uniform attachment approach. ECO Cladding’s Alpha brackets offer a turn-key solution for the increasingly rigorous demands of engineering and thermal performance.

Proud to be part of a building that carries this much meaning. The Martin Luther King, Jr. Center at Bowie State Univers...
10/06/2026

Proud to be part of a building that carries this much meaning. The Martin Luther King, Jr. Center at Bowie State University, Maryland's oldest HBCU, is more than a new academic facility. Designed by Perkins + Will, it's a landmark built to honor a legacy, inspire a generation, and give architectural form to Dr. King's vision of justice, identity, and courage.

ECO Cladding supplied the engineered subframing system supporting the building's terracotta rainscreen façade, designed to accommodate the increased structural demands of the material while ensuring long-term performance and precision alignment across the entire wall assembly.

Behind every great façade is an engineered system working hard to hold it all together. We're honored this one carries Dr. King's name.

The new Library Learning Commons at Chaffey College in Rancho Cucamonga, CA, is more than a building; it's a campus land...
09/22/2026

The new Library Learning Commons at Chaffey College in Rancho Cucamonga, CA, is more than a building; it's a campus landmark built to inspire student success.

Designed by DLR Group and constructed by Swinerton Builders, the striking façade features TAKTL Ultra-High Performance Concrete (UHPC) panels supported by our engineered subframing system for fiber concrete panels, installed by Rutherford Co., Inc.

The result? A bold, durable, and architecturally refined exterior that reflects the college's commitment to inclusive, transformative education.

See the full project: https://loom.ly/qlxQrjs

Two cladding materials. One cohesive subframing. Zero compromise. The Betty Engelstad School of Health & Sciences in Hen...
09/15/2026

Two cladding materials. One cohesive subframing. Zero compromise.

The Betty Engelstad School of Health & Sciences in Henderson, NV, is a prime example of how intentional subframing selection makes all the difference.

Designed by SH Architecture and KNIT for a joint-use facility serving both the College of Southern Nevada and Nevada State College, this state-of-the-art health sciences building demanded a building envelope that could perform at every level.

Here's what made subframing selection critical on this project:

▪️Dual cladding materials — Both Fiber Cement and UHPC panels were specified, each with different weights, tolerances, and attachment requirements — requiring a subframing system engineered to handle both seamlessly
▪️High-performance rainscreen — The system needed to support proper drainage, ventilation, and moisture management behind two distinct panel types
▪️Non-combustible construction — A public education facility requires strict adherence to fire-resistance standards, making non-combustible subframing essential
▪️Institutional durability — Built to serve students for decades, the envelope system had to deliver long-term reliability with minimal maintenance

Our engineered subframing system supported both cladding materials within a single, unified rainscreen façade, proving that versatility and performance aren't mutually exclusive.

Learn more about this project: https://www.ecocladding.com/ecoproject/betty-engelstad-school-health-sciences-henderson-nv

Big things happening in Dallas! ECO Cladding is heading to Zak World of Façades Dallas on September 17th with Cladding C...
09/09/2026

Big things happening in Dallas!

ECO Cladding is heading to Zak World of Façades Dallas on September 17th with Cladding Corp to showcase one of our most versatile solutions yet: the Sigma Universal Stainless Steel Wall Bracket Program.

Engineered for flexibility, durability, and performance, the SigmaU Wall Bracket delivers:

✅ Universal compatibility across cladding types and attachment methods
✅ Stainless steel corrosion resistance — ideal for demanding and coastal environments
✅ Thermal efficiency to minimize bridging and support energy-efficient envelopes
✅ Simplified installation to reduce labor time on the job site

If you're specifying rainscreen systems or looking for smarter attachment solutions, come find us at our booth. Our technical team is ready to talk project applications and next-gen subframing innovation.

Not yet registered? Secure your spot: https://facades.us.com/dal/

Subframing selection isn't an afterthought; it's a critical design decision. The Berrie Expansion at Columbia University...
09/03/2026

Subframing selection isn't an afterthought; it's a critical design decision. The Berrie Expansion at Columbia University Irving Medical Center is a great example of why. Designed by Kohn Pedersen Fox, this groundbreaking 9-story addition is set to become NYC's first Net Zero-capable laboratory building, and every component of the building envelope had to perform at the highest level.

When specifying cladding subframing for a project like this, key factors include:

➡️ Cladding material compatibility - UHPC panels require a precisely engineered attachment system to handle the weight and tolerances of high-performance concrete
➡️ Thermal efficiency - Continuous insulation and minimizing thermal bridging are non-negotiable on a Net Zero project
➡️ Durability - A medical research facility demands long-term performance with minimal maintenance
➡️ Code compliance - Non-combustible subframing supports NFPA 285 requirements and simplifies the overall envelope assembly

Our panel attachment systems for fiber-concrete panels checked every box, delivering a rainscreen solution built for both performance and sustainability goals.

See the full project details here: https://www.ecocladding.com/ecoproject/columbia-university-irving-medical-center-berrie-expansion-new-york-ny

Recent updates to NYC's building code have caused confusion around Metal Composite Material (MCM) and Aluminum Composite...
09/01/2026

Recent updates to NYC's building code have caused confusion around Metal Composite Material (MCM) and Aluminum Composite Material (ACM) rainscreen systems, with many assuming they're now prohibited.

They're not.

Section 718.2.6 focuses on proper fireblocking within concealed rainscreen cavities when combustible materials are used — not on banning specific cladding types. And yes, this applies to buildings under 40 feet, independent of NFPA 285 requirements.

The good news? Non-combustible subframing systems - like our Sigma U Series - simplify compliance while delivering superior thermal performance and design flexibility.

Read our full breakdown to understand what the code actually requires and how to specify with confidence: https://www.ecocladding.com/blog/clearing-confusion-mcm-rainscreens-and-nycs-section-71826

Designed by KieranTimberlake, the 328,000 SF West Campus Graduate Residence at MIT in Cambridge, MA delivers needed hous...
08/26/2026

Designed by KieranTimberlake, the 328,000 SF West Campus Graduate Residence at MIT in Cambridge, MA delivers needed housing for MIT graduate students and their families, rising to 10 stories and seamlessly integrating with the architecture of the surrounding historic district.

Our team supplied the sub-framing systems that form the structural backbone of the building envelope, ensuring precision and long-term performance on this landmark campus housing project. We are proud to have contributed to such a meaningful development for the MIT community.

Working on a large-scale residential or academic project? Contact us for guidance on your next build.

📸 Brooklyn Digital Foundry

The Black Hawk College Building 2 – Career & Tech Center Renovation in Moline, IL is a masterclass in what's possible wh...
08/20/2026

The Black Hawk College Building 2 – Career & Tech Center Renovation in Moline, IL is a masterclass in what's possible when the right system meets an extraordinary challenge.

What made this project so remarkable? This 55-year-old building was completely transformed into a modern, cohesive academic facility, all while concealing an almost unbelievable amount of complexity behind the finished façade. We're talking 20+ wall-assembly combinations, cavity depths ranging from 1" to 14", five different existing substrate types, and three distinct cladding materials: Swisspearl high-density fiber cement panels, ACM, and Prodema HPL, all unified into one continuous, visually seamless exterior.

Our SigmaU Universal Wall Bracket family, every size from U.2 through U.12, was deployed across the entire building in both vertical and horizontal orientations, creating a coordinated subframing platform across varied and inconsistent existing substrate conditions. No separate systems. No patchwork solutions. Just one engineered approach that adapted to every substrate, every depth, and every cladding type.

Grateful to be part of the engineered rainscreen subframing solution for the new Gilcrease Museum, a $150M+ reimagining ...
08/18/2026

Grateful to be part of the engineered rainscreen subframing solution for the new Gilcrease Museum, a $150M+ reimagining of one of America's premier museums of Western art and Native American history.

The Challenge: 19,000 SF of large-format architectural metal panel rainscreen across complex, non-rectangular geometry inspired by Osage cultural traditions. The façade required exceptional panel alignment, consistent joint spacing, and continuous cavity ventilation across numerous transitions and changing wall planes — while meeting the stringent durability requirements of a world-class museum protecting irreplaceable collections.

The Solution: Our subframing systems were integrated early in design, coordinating structural loading, thermal performance, moisture management, and attachment as a single engineered wall assembly. Intermittent stainless-steel Sigma wall brackets minimized thermal bridging, while the ventilated cavity promoted drainage and long-term moisture management. The system's built-in adjustability allowed the installation team to maintain precise panel alignment despite the building's complex geometry - without extensive field modification!

Looking back at an iconic project, the National Museum of African American History & Culture on the National Mall in Was...
08/13/2026

Looking back at an iconic project, the National Museum of African American History & Culture on the National Mall in Washington, D.C. This is more than a building; it's a landmark that represents the backbone of American history.

Designed by the celebrated Freelon Adjaye Bond / SmithGroup team, every detail of this structure was intentional. The iconic corona shape is inspired by a Yoruban caryatid column capital, while the 3,600 bronze-colored panels of the building's screen reference the ironwork crafted by African Americans across the American South. Even the front porch, a symbol of welcome and community, was deliberately incorporated into the design.

We're grateful to have supplied the engineered sub-framing system for the UHPC panels that helped bring the front entrance of this icon to life, supporting one of the most meaningful additons to the National Mall in recent years.

Completed in 2016, the NMAAHC continues to transform the role of civic architecture, and we are honored to have played a small part in its story.

Address

640 Airport Road, Level 1
Wi******er, VA
22602

Opening Hours

Monday 8am - 5pm
Tuesday 8am - 5pm
Wednesday 8am - 5pm
Thursday 8am - 5pm
Friday 8am - 5pm

Alerts

Be the first to know and let us send you an email when ECO Cladding posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to ECO Cladding:

Shortcuts

Share