04/22/2026
Check out some of the Fuller Mechanical crew putting in some serious work up in Phillips, WI! We headed north to tackle a heavy-duty truck dump dismantle, and it was a solid day of precision and power. The guys broke out the Air Arc to slice through those stubborn, thick-gauge weldments, making short work of the structural steel.
Once the cutting was done, we used some high-level rigging to make sure every section was locked down and balanced before the crane moved in. It was a smooth operation watching the crane hoist the structure clear from its original footprint and swing it over to the staging area. We got everything set down perfectly, prepped and ready to be hauled away. Not to mention, we had beautiful weather all week!