10/29/2026
Yesterday’s project had us doing a little bit of everything. We started by setting up and pouring flatwork, then moved on to digging a drainage ditch and installing a 40’ culvert. To top it all off, we hauled in rock to give the finished project a clean look!
At Brummett Concrete, we take pride in every step of the job, from start to finish! 💪🏼