05/14/2026
From bare slab to fully functional bathroom.
This space had zero existing plumbing, so we started from the ground up—literally. We cut into the concrete slab, excavated a trench, and installed all-new drain lines connected to the home’s main sewer line. After setting the toilet fl**ge and shower drain in their exact locations, we backfilled and re-poured the concrete to bring the foundation back together.
The result: a seamless new bathroom built where none existed before.