Step-by-Step Foundation Construction Process (From Site to Plinth)

1️⃣ Site Investigation & Soil Test

What is done:
Engineers examine the soil using trial pits or boreholes, and samples are tested in a laboratory.

Purpose:
To determine soil bearing capacity, foundation type and depth, and groundwater level.

Why important:
Prevents foundation failure, settlement, and cracks.

2️⃣ Layout Marking

What is done:
Building lines, foundation width, and wall positions are marked using pegs, string, and lime.

Purpose:
Ensures correct building position and size.
Why important:
Avoids alignment and dimensional errors.

3️⃣ Excavation

What is done:
Soil is excavated to the required depth to form trenches according to the layout.

Purpose:
To reach firm soil capable of carrying building loads.

Why important:
Shallow or weak excavation can cause foundation failure.

4️⃣ Dewatering

What is done:
Water in excavated pits is removed using pumps.

Purpose:
Keeps foundation trenches dry.

Why important:
Concrete should not be poured in water, and soil weakening is prevented.

5️⃣ Anti-Termite Treatment

What is done:
A chemical solution is sprayed on the soil.

Purpose:
Protects the building from termites and insects.

Why important:
Termites can damage wooden components and weaken the structure.

6️⃣ PCC (Plain Cement Concrete / Lean Concrete)

What is done:
A thin PCC layer is laid at the bottom of the excavation.

Purpose:
Provides a clean, level base and separates concrete from soil.

Why important:
Improves footing durability and alignment.

7️⃣ Shuttering (Formwork)

What is done:
Wooden or steel formwork is fixed around the footing.

Purpose:
Gives shape to concrete.

Why important:
Ensures correct dimensions and smooth finish.

8️⃣ Reinforcement

What is done:
Steel reinforcement bars are placed inside the formwork.

Purpose:
Increases the tensile strength of concrete.

Why important:
Concrete is weak in tension; steel resists tensile forces.

9️⃣ Concrete Pouring

What is done:
Concrete is poured and compacted using rods or vi*****rs.

Purpose:
Forms the foundation footing.

Why important:
Proper compaction prevents honeycombing and weak concrete.

🔟 Curing

What is done:
Concrete is watered regularly.

Purpose:
Maintains moisture for cement hydration.

Why important:
Increases strength and prevents cracks.

1️⃣1️⃣ Backfilling

What is done:
Excavated soil is refilled and compacted in layers.

Purpose:
Restores ground level and provides lateral support.

Why important:
Prevents settlement around the foundation.

1️⃣2️⃣ Plinth Construction

What is done:
Plinth beam and blockwork are constructed above ground level.

Thi công bồn chứa công nghiệp !!!Lh: 0969.807.066
19/12/2025

Thi công bồn chứa công nghiệp !!!
Lh: 0969.807.066

Address

N5 Tdc Cường Thuận, Phước Tân
Biên Hòa

Website

Alerts

Be the first to know and let us send you an email when CƠ KHÍ và XÂY DỰNG ĐỒNG NAI posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Shortcuts

Share