nhà máy Xi Măng vẫn lắp ĐMT được tốt: giảm 30% chi phí điện năng = hệ 21MW với 4 cụm biến tần Sunny Central Up 4.4MW
30 percent less energy costs and more climate-friendly production: The SEZA ÇİMENTO cement factory in Elazığ, Turkey, relies on solar energy to meet this challenge.
A PV power plant with 21 megawatts of capacity and 4 Sunny Central Up 4400 central inverters provides 31,836 megawatt hours of clean solar power annually. At the same time, the environment is protected from the emission of 13,105 tons of CO2.