23/06/2020
Morning brethren. So it has began again, after a long wait because of Lockdown. Busy with renovations on this flat that was build with no Pillars. Did the Pillars and we are going to plaster the flat inside and outside. Fit tiles, wooden floor, ceiling and finish the half installed plumbing. We will keep you posted.