12/03/2026
Phase two of our project at The Verve, Simbithi is well underway, and it’s a great reminder of how important teamwork is.
Teamwork is something we’re really proud of at 365Solar. Our in-house installers are trained, certified, and properly in sync. The kind of team that communicates without ego, solves problems on the fly, and still manages a laugh on site while getting the job done right.
This hybrid Sigenergy solution consists of a 300kW Sigen Energy Gateway, 9 x SigenStor energy controller/battery stacks with generator integration, is no small task. It requires coordination, precision, and serious teamwork from delivery to commissioning.
Every piece of equipment is handled with care.
Every connection double-checked.
Every step completed as a unit.
At the end of the day, great equipment is only half the story.
It’s the people installing it, the communication behind the scenes, and the teamwork on site that turn quality components into a system that performs exactly as it should.
365Solar, powered by people, every day of the year.
Herholdt's Group Group Miramar Projects Simbithi Verve Simbithi Eco Estate Investec Sigenergy Investec