26/04/2024
We recently assisted the engineering team on one of our factory projects to scan the existing in situ reinforced,suspended concrete floor slab.This was done to determine whether the proposed support propping layout was adequate to carry the imposed loads by the movement of extremely heavy factory machinery.We then set up the props and bracing according to the engineering plan that was provided.We are delighted to say that the project was a success and the props were removed once all the other teams that were responsible for the moving of the machines were done with their scope of work.