Electro PV -Pty Ltd.

Electro PV -Pty Ltd. Solar and Electrical Construction Company

Another installation completed. Change Batteries on existing Mecer Back Up system and installed DC protection. Thank you...
21/06/2021

Another installation completed. Change Batteries on existing Mecer Back Up system and installed DC protection. Thank you Rocco from Ingwe Projects and Consulting (Pty) Ltd for using us for your project.

Another installation completed. 5 KW Kodak Back Up systems installed for our client. Thank you Rocco from Ingwe Projects...
21/06/2021

Another installation completed.
5 KW Kodak Back Up systems installed for our client. Thank you Rocco from Ingwe Projects and Consulting (Pty) Ltd for using us for the project.

For all your Solar, electrical and security construction needs you can always rely on ELECTRO PV to provide top quality ...
18/06/2021

For all your Solar, electrical and security construction needs you can always rely on ELECTRO PV to provide top quality service and products.

You can visit their website at
www.electropv.co.za

Or their page at https://www.facebook.com/Electropv/

Or can contact louis at 064 925 8902

Mr. South Africa


For any solar, electrical and security installations you can contact Louis on 0649258902, for excellent workmanship and ...
15/06/2021

For any solar, electrical and security installations you can contact Louis on 0649258902, for excellent workmanship and quality service guaranteed. You can also visit our fb page https://www.facebook.com/Electropv/. References can be given if required.

Another Project completed to our client.  5 KW Kodak inverter with Battery bank to be used as a Back-up System only ( UP...
11/06/2021

Another Project completed to our client. 5 KW Kodak inverter with Battery bank to be used as a Back-up System only ( UPS).Thanks go out to Ingwe Projects & Consultants for using us for the installation.

For excellent workmanship and quality work you can contact Louis on 0649258902.
19/05/2021

For excellent workmanship and quality work you can contact Louis on 0649258902.

5KW Kodak Storage system with 2x 4.8KWh Narada Batteries 48V. Another happy client. Thanks go out to Santos David (clien...
11/03/2021

5KW Kodak Storage system with 2x 4.8KWh Narada Batteries 48V. Another happy client. Thanks go out to Santos David (client) in Centurion and Stratos from DIY Geek that we done the installation for. From the ElectroPV Team.

5KW Kodak Hybrid Storage System with 4.8KWh Narada Battery 48V completed in Vereeniging. Another happy client. Thanks go...
11/03/2021

5KW Kodak Hybrid Storage System with 4.8KWh Narada Battery 48V completed in Vereeniging. Another happy client. Thanks go out to Hennie Vermaak (client) and Jan from PN Bululu Trading that we done the installation work .From ElerctroPV Team.

See this BIZ NEWS artical.Eskom: Energy expert warns of electricity catastrophe in SA19th January 2021 by Melani Nathan ...
20/01/2021

See this BIZ NEWS artical.
Eskom: Energy expert warns of electricity catastrophe in SA
19th January 2021 by Melani Nathan
expert Ted Blom has a view of Eskom which few of us will ever see. He was hired to rebuild Eskom’s coal roadmap. During his research Blom noted that Eskom was facing what the Fossil Fuel Foundation called a ‘coal cliff’. In a 2018 interview with BizNews, Blom said Eskom had, once upon a time, announced that it would open 40 new coal mines. That didn’t happen and instead the state owned power utility decided to open three new power stations. Medupi and Kusile have been plagued by breakdowns due to lapses in maintenance at the plants. Neither facility currently functions at full capacity. As for the abandoned coal mining plan, those chickens have also come home to roost. Eskom says breakdowns at its major units coincide with a lack of fuel at open cycle gas turbine and pumped fuel stations. MyBroadBand speaks to Ted Blom about the true extent of Eskom’s power generation shortfall and what it means for load shedding in 2021. – Melani Nathan

Eskom Stage 8 load-shedding possible, warns Ted Blom
By Hanno Labuschagne

South Africans should brace themselves for the worst year of load-shedding yet in 2021, with Stage 8 being a possibility before the end of winter.

This is the view of power and mining expert Ted Blom, who spoke to the Free Market Foundation’s Chris Hattingh during the latest episode of the Free Marketeers podcast.

Ted Blom.
Ted Blom.
Blom’s warning comes after Eskom announced on Sunday it would have to continue with Stage 2 load-shedding. Blom subsequently provided his analysis of the utility’s situation and a prognosis for load-shedding in the next year.

Blom claimed that Eskom was understating the amount of power it was actually shedding from the national grid.

This, he said, is because Eskom already interrupts 2,000MW of supply to its big customers when it announces load-shedding for the general public.

“When Eskom says we are having Stage 1 load-shedding or shedding 1,000MW, to the economy it is in fact a 3,000MW shortage,” Blom said.

He stated that by Eskom’s rules of engagement, Stage 1 would be implemented when up to 1,000MW would need to be shed, Stage 2 when up to 2,000MW needed to be shed, and so on.

While Eskom has over the past week said it is shedding at Stage 2, Blom said it has consistently been over 2,000MW short, which technically means Stage 3 is in effect.

“So in actual fact, if you add the numbers together, it’s the 2,000MW from the interruptible chaps, plus 2,000MW from the public, plus the residual for which they are over 2,000MW,” Blom stated.

“That in fact makes it about Stage 5 load-shedding if Eskom was more transparent and honest in its dealings with the public,” he said.

Worst year of load-shedding
Blom said that Eskom is capable of handling about 11,000MW of shortages before having to implement load-shedding.

However, the utility’s outlook for the next three months in its latest system status report showed a near-consistent unavailability of 20,000MW or more when taking both planned maintenance work and unplanned outages into account.

This would mean that the deficit over the next three months would hover around 9,000MW.

“Therefore I feel quite comfortable saying that I will not be surprised that between now and the end of winter we will experience Stage 6 load-shedding, pretty much for certain, and even Stage 8 or above is a possibility.”

Based on Eskom’s own forecasts, 2021 is going to be the worst year of load-shedding on record, Blom stated.

“The outlook on Eskom’s own data is worse than last year. If it materialises it will be the worst in the history of Eskom,” Blom said.

This would follow load-shedding increasing both in terms of the number of days and MWh shed over the last few years – reaching 52 days and over 1,260,000MWh in 2020.

What happens at Stage 8
Stage 8 load-shedding is implemented when 8,000MW needs to be shed from the national grid in order to prevent a total collapse of the system.

During stage 8, consumers can expect much more frequent power cuts, to be without electricity for 48 hours over four days, or 50% of the time.

The worst level of load-shedding previously experienced in South Africa was Stage 6, which was implemented in December 2019 after a technical problem at Medupi Power Station.

At the time, Eskom needed to shed 6,000MW, which meant that around 40% of its capacity had been unavailable.

The infographic below provides more details regarding Eskom’s load-shedding stages.

Update – Eskom response
Eskom has told MyBroadband that while it endeavours to only load shed at Stage 4 or below and only when truly necessary, higher stages of load shedding could be required.

This would be the case if there are numerous, simultaneous breakdowns of generating units and depleted fuel levels at the OCGT (open cycle gas turbines) and pumped storage power stations.

“In the planning scenarios considered, at an unplanned unavailability of up to 14,000 MW of capacity, up to Stage 3 load-shedding is possible,” Eskom said.

“However, if this coincides with depleted fuel at pumped storage and OCGT power stations, higher stages of load-shedding are possible,” it added.content://com.android.chrome.FileProvider/images/screenshot/16111380223514174030663982710470.jpg

01/11/2020

ElectroPV. Contact us for a free quote and then you can apply for funding at a extra 5% cost mark up through FinYou.

4.6 KW Good We Inverter Storage System with 7 KW Pylon Tech Battery Bank Installed in Sandton Site 2
13/07/2020

4.6 KW Good We Inverter Storage System with 7 KW Pylon Tech Battery Bank Installed in Sandton Site 2

4.6 KW Good We Inverter Storage System with 7 KW Pylon Tech Battery Bank Installed in Sandton Site 1
13/07/2020

4.6 KW Good We Inverter Storage System with 7 KW Pylon Tech Battery Bank Installed in Sandton Site 1

Address

Plot 65, Pelindaba
Hartebeestpoort
1911

Opening Hours

Monday 07:00 - 16:30
Tuesday 07:00 - 16:30
Wednesday 07:00 - 16:30
Thursday 07:00 - 16:30
Friday 07:00 - 16:30

Telephone

+27649258902

Alerts

Be the first to know and let us send you an email when Electro PV -Pty Ltd. posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Electro PV -Pty Ltd.:

Share