Kuyler Electrical

Kuyler Electrical Electrical company started 2012

Project almost done…….99.9% Busy with snags and extra’sFernkloofHermanus Overberg
24/06/2026

Project almost done…….
99.9%
Busy with snags and extra’s
Fernkloof
Hermanus
Overberg

18/06/2026
All done ……New spotlight installation done at Hermanus Bowling Club12x 200W LED Spotlights7.8 m above bowling green
17/06/2026

All done ……
New spotlight installation done at Hermanus Bowling Club

12x 200W LED Spotlights
7.8 m above bowling green

17/06/2026
All up, now for the correct angles….
17/06/2026

All up, now for the correct angles….

A serene early morning sunrise on a picture perfect public holiday.
16/06/2026

A serene early morning sunrise on a picture perfect public holiday.

15/06/2026

ESKOM UPDATE:
HEMEL-EN-AARDE VALLEY
15 June 2026

Eskom has reported another incident of cable theft in the Hemel-en-Aarde Valley this morning, with approximately 15 spans of copper conductor stolen.

According to Eskom's Sector Manager, repair work that was scheduled to be completed today has been significantly impacted by the latest theft.

As a result, Eskom will unfortunately not be able to complete the repairs as planned.

At this stage, Eskom has not provided a new estimated time of restoration (ETR) for customers who remain without electricity.

Issued by:
Overstrand Municipal Manager, Dr Dean O’Neill

First one up…..Whatch the space ….. more comming For the final project🔆
15/06/2026

First one up…..
Whatch the space ….. more comming

For the final project🔆

Some late nights, progress on several sitesDoing the extra to stay on time…..To be continued…….
15/06/2026

Some late nights, progress on several sites
Doing the extra to stay on time…..
To be continued…….

Meter Box Lid ReplacementThe damaged meter box lid was replaced with a custom-manufactured stainless steel lid.The new l...
02/06/2026

Meter Box Lid Replacement

The damaged meter box lid was replaced with a custom-manufactured stainless steel lid.

The new lid was manufactured and supplied by Michelle Pluhar Swart – R-Tac Stainless steel.
The stainless steel construction ensures improved resistance to corrosion, weather conditions, and general wear, resulting in an everlasting and low-maintenance installation.

Address

7 Argon Str , Unit 25
Hermanus
7200

Alerts

Be the first to know and let us send you an email when Kuyler Electrical posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Shortcuts

Share