24/01/2018
W.P INVESTMENT&ENGINEERING (PTY) LTD.
STEEL STRUCTURES,CAPORTS,ROOFING,GUTTERS,REPAirs to all steel structures, roofing
NB!!!NB!!!NB!!!NB!!!NB!!!NB!!!NB!!!
NO DEPOSIT NEEDE!!!
GEEN DEPOSITO NOODAG!!!
Vervoer kostes nie ingesluit nie
Length span hight Sq Price
20 X 9 X 3.6 180 R 63,000.00
20 X 12 X 3.6 240 R 93,600.00
30 X 15 X 4.5 450 R 175,500.00
30 X 18 X 4.5 540 R 243,000.00
40 X 18 X 4.5 720 R 316,800.00
30 X 20 X 4.5 600 R 270,000.00
40 X 20 X 4.5 800 R 352,000.00
20 X 9 X 4.5 180 R 64,800.00
20 X 10 X 4.5 200 R 76,000.00
20 X 12 X 4.5 240 R 96,000.00
40 X 9 X 4.5 360 R 129,600.00
40 X 10 X 4.5 400 R 152,000.00
40 X 12 X 4.5 480 R 187,200.00
PRYSE SLUIT IN DIE VOLGENDE
: FONDASIES
: VOLLEDIGE VERVAARDIGE STRUCTUUR
: ALLE BOUTE EN MOERE
: OPRIGTING
: SINK DAK GALV
AFLEWERING EN OPRIGTING LANDWYD
AFLEWERING KOSTES UITGESLUIT
ANDER GROOTTES KAN VERVAARDIG WORD OP AANVRA
ALLE STRUCTURE WORD UIT;
140 AA IPE IBEAMS
160 AA IPE IBEAMS
180 AA IPE IBEAMS
200 AA IPE IBEAMS
205 AA IPE IBEAMS
UIT VERVAARDIG!!
SKAKEL VANDAG NOG!!!
W.P INVESTMENT AND ENGINEERING;
KANTOOR:0603600891
OF EPOS; [email protected]