COMMON MISTAKES IN SETTING OUT A BUILDING
At TCP , we believe setting out is the true foundation of every construction project. Once errors occur at this stage, the entire building suffers. Sadly, many projects still get it wrong due to carelessness or poor supervision.
Here are the most frequent mistakes we encounter on-site:
๐ธ Wrong Baseline โ Starting with an incorrect reference line shifts the entire building out of position.
๐ธ Poor Squaring โ Failure to apply the 3-4-5 rule or Pythagoras theorem results in crooked walls.
๐ธ Inaccurate Measurements โ Wrong tape readings or lack of double-checking distorts the building dimensions.
๐ธ Ignoring Profile Boards โ Placing pegs too close to trenches instead of using profile boards leads to loss of reference points after excavation.
๐ธ Encroachment โ Not confirming boundary lines carefully can cause the structure to extend into another personโs land.
๐ธ Lack of Leveling โ Skipping proper leveling produces uneven foundations and walls.
๐ธ No Professional Supervision โ Leaving setting out to untrained hands without the guidance of an engineer or builder is a costly mistake.
๐ At TCP , we emphasize one golden rule:
โIf you get the setting out wrong, the whole project goes wrong.โ