🛠️ Custom Solutions | Engineering | Manufacturing | Container Conversions

We’re striving to be South Africa’s leading manufacturer of custom engineering solutions by being solution-driven, innovative and adaptive.

This 24m substation is being packaged into four 4 x 12m high-cube containers, along with a separate 6m control room. At ...
03/07/2025

This 24m substation is being packaged into four 4 x 12m high-cube containers, along with a separate 6m control room. At the client’s request, standard shipping containers were used to reduce costs and simplify international logistics. Unlike most of our larger E-houses, this unit will be assembled on-site.

Product: 24 x 5m, E-House with 6m Control Room
Mass: 45 ton
Corrosion Protection: C5
End user: Reko Diq Mining Company (RDMC)

Powerful partnerships. Real results. Solve Engineering Solutions and XCEED unite to offer customers seamless, end-to-end...
25/06/2025

Powerful partnerships. Real results. 
Solve Engineering Solutions and XCEED unite to offer customers seamless, end-to-end turnkey delivery. 
Thanks to the 150+ industry leaders who joined us at our Open Day!

20/06/2025

The final product - loaded and on its way to a satisfied customer. This mobile substation has been engineered and fabricated according to Solves' proprietary design philosophy, featuring a structure that is entirely free from welding. The factory-fitted roof provides robust protection, minimising on-site installation work and ensuring complete waterproof integrity from the factory floor to the final installation location.

Product: 20m x 5m, E-House
Mass: 79,000kg
Corrosion Protection: C5M
Number of modules manufactured: 1
Switchgear: TGOOD
End user: POWERCHINA Huadong Engineering Corporation Limited
Destination: De Aar, Northern Cape

Built to last with a 20-years lifetime expectancy. This mobile substation is manufactured from 3CR12 stainless steel and...
16/05/2025

Built to last with a 20-years lifetime expectancy. This mobile substation is manufactured from 3CR12 stainless steel and protected with a C5M corrosion protection system to withstand the worst environmental conditions.

Product: E-House Skid Assembly
Number of modules manufactured: 1
End user: Anglo American
Destination: ACP Anglo Platinum

Built to last with a 20-years lifetime expectancy. This mobile substation is manufactured from 3CR12 stainless  steel an...
16/05/2025

Built to last with a 20-years lifetime expectancy. This mobile substation is manufactured from 3CR12 stainless steel and protected with a C5M corrosion protection system to withstand the worst environmental conditions.

Product: E-House Skid Assembly
Number of modules manufactured: 1
End user: Anglo American
Destination: ACP Anglo Platinum

See the progress of this base and wall construction for a 100 square meter mobile substation.Product: 20m x 5m, E-HouseN...
22/04/2025

See the progress of this base and wall construction for a 100 square meter mobile substation.

Product: 20m x 5m, E-House
Number of modules manufactured: 1
Switchgear: TGOOD
End user: POWERCHINA Huadong Engineering Corporation Limited
Destination: De Aar, Northern Cape

See the progress of this base and wall construction for a 100 square meter mobile substation.Product: 20m x 5m, E-HouseN...
22/04/2025

See the progress of this base and wall construction for a 100 square meter mobile substation.

Product: 20m x 5m, E-House
Number of modules manufactured: 1
Switchgear: TGOOD
End user: POWERCHINA Huadong Engineering
Corporation Limited
Destination: De Aar, Northern Cape

Coming together beautifully. From tiny bits to a premium final product.Product: E-House Skid AssemblyNumber of modules m...
15/04/2025

Coming together beautifully. From tiny bits to a premium final product.

Product: E-House Skid Assembly
Number of modules manufactured: 2
End user: Barrick Gold
Destination: Lumwana

Solving it ourselves.Our key differentiator is our in-house engineering capability which significantly improves our proj...
25/03/2025

Solving it ourselves.

Our key differentiator is our in-house engineering capability which significantly improves our project turnaround times.



Product: E-House Skid Assembly

Number of modules manufactured: 2

Client:

End user:

Destination: Lumwana

17/03/2025

Behind the scenes of yet another Solve solution. This robust, custom-built BESS is coming together flawlessly, with no limitations to length, width or height.

Custom-Built BESS
Dimensions: 8 x 2.6 (meter)
Number of modules manufactured: 1
Client: Kathea Energy
End user: Aquelle
Destination: Franschhoek, Western Cape

Address

Solve Engineering Solutions 59 New Road, Glen Austin AH
Midrand
1685

Opening Hours

Monday 07:00 - 16:00
Tuesday 07:00 - 16:00
Wednesday 07:00 - 16:00
Thursday 07:00 - 16:00
Friday 07:00 - 16:00

Telephone

+27820470505

Alerts

Be the first to know and let us send you an email when Solve Enigineering Solutions posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Shortcuts

Share