04/06/2026
๐ฆ๐๐ฒ๐ฝ ๐ฐ ๐ถ๐ป ๐ฏ๐๐ถ๐น๐ฑ๐ถ๐ป๐ด ๐ฎ ๐ฆ๐ผ๐น๐ฎ๐ฟ ๐ฃ๐ผ๐๐ฒ๐ฟ ๐ฃ๐น๐ฎ๐ป๐: ๐ฅ๐ข๐๐๐ช๐ข๐ฅ๐๐ฆ
Roads are the first structures to built on the site. A surveyors mark out the roads and construction teams build them based on approved designs.
These roads allow equipment and workers to move around safely during the build.
Executive Mayor of Ngwathe: Cllr Victoria de Beer Ngwathe LM