30/06/2026
2x 650kva Synchronized Generator's
FAT (Factory Acceptance Test) at LPSA.
We will be installing these 2x Generators synchronized onto a step up transformer which will be feeding an MV Sub and then from the Sub out to Various Transformers in the Existing Plant.
Watch this space for progress pics on the installation.