ATC Projects

ATC Projects Contact information, map and directions, contact form, opening hours, services, ratings, photos, videos and announcements from ATC Projects, Westring, Port Elizabeth.

ATC Projects team constructed concrete slab in front of engineering shop in Sidwell, Port Elizabeth.🚧
01/02/2022

ATC Projects team constructed concrete slab in front of engineering shop in Sidwell, Port Elizabeth.🚧

Beautiful paving done in Westering, by our ATC Projects team🀩
20/01/2022

Beautiful paving done in Westering, by our ATC Projects team🀩

ATC Projects doing Asphalt Overlay on tar road at a  townhouse complex in Lorraine.⚠️🚧
18/12/2021

ATC Projects doing Asphalt Overlay on tar road at a townhouse complex in Lorraine.⚠️🚧

07/12/2021

2021 completed tarring projects, done by the ATC team😎

ATC projects busy with a tar driveway, in Framesby πŸ‘·β€β™‚οΈ
29/11/2021

ATC projects busy with a tar driveway, in Framesby πŸ‘·β€β™‚οΈ

29/11/2021

Small portion of paving done for 2021. Well done Team!! 😎🚧

ATC Projects layed 60mm charcoal interlocking paving with 100mm G5 base. We installed concrete water channels to prevent...
24/11/2021

ATC Projects layed 60mm charcoal interlocking paving with 100mm G5 base. We installed concrete water channels to prevent rain water from flooding the garage and channeling the water down the side of the house.🚧

Small paving project in Sharwood st Summerstrand. βš’
15/11/2021

Small paving project in Sharwood st Summerstrand. βš’

ATC Projects completed a Bitumen Slurry project over concrete for parking area at flats.πŸš—πŸ…ΏοΈπŸš™
28/10/2021

ATC Projects completed a Bitumen Slurry project over concrete for parking area at flats.πŸš—πŸ…ΏοΈπŸš™

ATC Projects busy with Bitumen Slurry over concrete at a block of flats.🚧
21/10/2021

ATC Projects busy with Bitumen Slurry over concrete at a block of flats.🚧

ATC Projects team completing a Bitumen slurry project, at Pine Groves complex, in Lorraine πŸ›’πŸš§
19/09/2021

ATC Projects team completing a Bitumen slurry project, at Pine Groves complex, in Lorraine πŸ›’πŸš§

ATC team instelling edge kerbs, next to all the pathways, at a complex in Walmer 🚧
09/09/2021

ATC team instelling edge kerbs, next to all the pathways, at a complex in Walmer 🚧

Address

Westring
Port Elizabeth

Opening Hours

Monday 07:00 - 17:00
Tuesday 07:00 - 17:00
Wednesday 07:00 - 17:00
Thursday 07:00 - 17:00
Friday 07:00 - 17:00

Telephone

0721255056

Alerts

Be the first to know and let us send you an email when ATC Projects posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Share