02/07/2026
🏡 𝗧𝗵𝗲 𝗭𝗶𝗺𝗯𝗮𝗯𝘄𝗲 𝗛𝗼𝗺𝗲 𝗕𝘂𝗶𝗹𝗱𝗶𝗻𝗴 𝗝𝗼𝘂𝗿𝗻𝗲𝘆 – 𝗣𝗮𝗿𝘁 𝟯: 𝗧𝗵𝗲 𝗕𝘂𝗱𝗴𝗲𝘁 𝗠𝗶𝘀𝘁𝗮𝗸𝗲𝘀 𝗧𝗵𝗮𝘁 𝗟𝗲𝗮𝘃𝗲 𝗠𝗮𝗻𝘆 𝗭𝗶𝗺𝗯𝗮𝗯𝘄𝗲𝗮𝗻 𝗛𝗼𝗺𝗲𝘀 𝗨𝗻𝗳𝗶𝗻𝗶𝘀𝗵𝗲𝗱.
In Part 1, we explored how choosing the right stand lays the foundation for a successful project.
In Part 2, we discussed why every great home begins with thoughtful planning before an architect ever starts drawing.
Now we come to the stage where many dream homes begin to struggle.
𝗧𝗵𝗲 𝗯𝘂𝗱𝗴𝗲𝘁.
One lesson we've learnt after working with homeowners over the years is this:
Most people don't underestimate the cost of building a house.
They underestimate everything else that comes with building a house.
Many families sit down and decide they have enough money to build.
They calculate the bricks.
They estimate the cement.
They think about roofing.
Then construction begins...
..and suddenly they discover there are thousands of dollars in costs they never planned for.
𝗧𝗵𝗲 𝗛𝗼𝘂𝘀𝗲 𝗗𝗼𝗲𝘀𝗻'𝘁 𝗦𝘁𝗮𝗿𝘁 𝗪𝗶𝘁𝗵 𝗕𝗿𝗶𝗰𝗸𝘀.
One of the first surprises many first-time builders encounter is that construction doesn't begin with foundations.
It begins with preparing the site.
In many of Zimbabwe's newer residential developments, there is either no council water connection or the council water supply is unreliable.
Before a single brick is laid, homeowners are often faced with an important decision.
Do we drill our own borehole?
A borehole has become more than a convenience.
For many projects, it's almost a necessity.
Today, drilling and equipping a basic borehole can cost anywhere between US$1,500 and US$2,500, depending on depth and site conditions. That usually includes drilling, a submersible pump and the basic installation needed to make the water usable.
You'll also need somewhere to store that water.
A 5,000-litre water tank alone costs around US$400, and many homeowners choose even larger tanks depending on their long-term water needs.
Some people decide not to drill a borehole immediately.
Instead, they buy water for construction.
But even that comes at a cost.
A 5,000-litre water delivery can cost around US$50, and a busy construction site can require multiple deliveries over the course of a project.
These are expenses many people never include when preparing their original budget.
𝗕𝗲𝗳𝗼𝗿𝗲 𝗖𝗼𝗻𝘀𝘁𝗿𝘂𝗰𝘁𝗶𝗼𝗻 𝗕𝗲𝗴𝗶𝗻𝘀, 𝗬𝗼𝘂𝗿 𝗪𝗮𝗹𝗹𝗲𝘁 𝗛𝗮𝘀 𝗔𝗹𝗿𝗲𝗮𝗱𝘆 𝗦𝘁𝗮𝗿𝘁𝗲𝗱 𝗪𝗼𝗿𝗸𝗶𝗻𝗴
Water isn't the only hidden cost.
Materials need to be protected.
Workers need somewhere secure to sleep.
Tools need safe storage.
On many Zimbabwean construction sites, workers stay on-site during the project to reduce transport costs and improve productivity.
That means many homeowners purchase a two-roomed cabin, typically costing US$350 to US$400, before construction even starts.
Some stands also require clearing, tree removal or levelling before work can begin.
Hiring a TLB currently costs around US$60 per hour, depending on the contractor and location.
When you add together a borehole, a water tank, a site cabin and initial site preparation, it's easy to spend around US$3,000 before the foundation is even excavated.
This catches many first-time builders completely by surprise.
𝗧𝗵𝗲 𝗕𝗶𝗴𝗴𝗲𝘀𝘁 𝗠𝗶𝘀𝘁𝗮𝗸𝗲? 𝗖𝗼𝗻𝗳𝘂𝘀𝗶𝗻𝗴 𝘁𝗵𝗲 𝗦𝗵𝗲𝗹𝗹 𝗪𝗶𝘁𝗵 𝘁𝗵𝗲 𝗛𝗼𝘂𝘀𝗲.
Over the years, one misunderstanding has stood out more than any other.
Many people believe that once they've completed the foundations, walls, roof and plastering, the expensive part is over.
In reality...
𝗧𝗵𝗲 𝘀𝗵𝗲𝗹𝗹 𝗶𝘀 𝗻𝗼𝘁 𝘁𝗵𝗲 𝗵𝗼𝘂𝘀𝗲.
In many cases, the finishes cost just as much—and sometimes even more—than people expect.
Think about everything that still has to be completed.
● Aluminium windows.
● Floor tiles.
● Ceilings.
● Cornices and skirting.
● Internal doors.
● Bathroom fittings.
● Toilets.
● Basins.
● Showers.
● Kitchen cupboards.
● Bedroom wardrobes.
● Electrical wiring.
● Light fittings.
● Plumbing.
● Painting.
● Boundary walls.
● Driveways.
Every one of these items requires careful budgeting.
This is one of the reasons you see so many homes across Zimbabwe occupied before they're truly complete.
Families move in without ceilings.
Concrete floors remain uncovered for years.
Bathrooms are only partially finished.
Walls remain unpainted.
Kitchen cupboards are postponed indefinitely.
The dream of "finishing next year" often becomes five or even ten years.
Not because people didn't work hard.
But because they underestimated what it actually costs to complete a home.
𝗖𝗵𝗮𝗻𝗴𝗶𝗻𝗴 𝗬𝗼𝘂𝗿 𝗠𝗶𝗻𝗱 𝗖𝗮𝗻 𝗕𝗲𝗰𝗼𝗺𝗲 𝗩𝗲𝗿𝘆 𝗘𝘅𝗽𝗲𝗻𝘀𝗶𝘃𝗲
I'd like to share another lesson from one of our own projects.
We once worked with a homeowner who started construction with a clear set of approved plans.
Everything went well in the beginning.
But as construction progressed, new ideas kept appearing.
"Let's make this bedroom bigger."
"Actually... I don't like this door anymore."
"Can we move this wall?"
"Let's add another window here."
Individually, none of these changes seemed significant.
But together, they changed the project dramatically.
Walls had to be altered.
Materials had to be reordered.
Labour increased.
The timeline stretched.
And most importantly...
The budget grew far beyond what had originally been planned.
One of the smartest financial decisions you can make is to spend more time planning before construction starts, rather than redesigning while construction is already underway.
Good planning is always cheaper than rebuilding.
𝗙𝗶𝗻𝗮𝗹 𝗧𝗵𝗼𝘂𝗴𝗵𝘁𝘀
A successful building project isn't just about having enough money.
It's about understanding where that money will be spent.
When homeowners budget only for the visible parts of a house, they often find themselves running out of money before the invisible—but essential—parts are complete.
The strongest projects begin with realistic expectations.
At Royal Kraal Construction, one of the most valuable conversations we have with clients happens before construction begins.
Helping someone understand the true cost of building is just as important as building the house itself.
Because a well-planned budget doesn't just save money.
It gives your dream home the best possible chance of being completed.
📖 𝗖𝗼𝗺𝗶𝗻𝗴 𝗡𝗲𝘅𝘁 𝗶𝗻 𝘁𝗵𝗲 𝗦𝗲𝗿𝗶𝗲𝘀
Part 4: Choosing the Right Architect & Contractor – Why Great House Plans Save You More Money Than They Cost
We'll explore how the right architect can help you maximise your stand, avoid costly design mistakes and create a home that works beautifully for years to come.
💬 Thinking of Building in the Next 12 Months?
If you're planning to build a home within the next year, simply comment "BUILD" below this post.
We'll send you our FREE Royal Kraal Construction Home Building Planning Checklist, created specifically for Zimbabwean homeowners. It will help you:
✅ Avoid costly mistakes before construction begins.
✅ Understand the key stages of building a home.
✅ Plan your project with confidence.
✅ Know the right questions to ask before hiring a builder.
No obligation. No sales pressure. Just practical advice to help you build smarter.
Sometimes the biggest savings don't come from spending less—they come from avoiding expensive mistakes.