Newick Pvt Ltd proposes to construction and operate a 50MW solar plant on a 100hac area. The farm and the company is owned by Mr. Jimaya Muduvuri. The major civil work involves, site levelling, construction of solar PV array foundations, inverter pedestals, switch yard structure and equipment foundations including control room cm admin building. Minor works involve security kiosks, water supply works, fencing, roads and drainage. The broad list of work involved in the civil package is given below:
• Cut and fill to produce even slope for the solar field (particularly for the disused effluent dug outs)
• Construction of Solar PV array foundations, Construction of Inverter pedestals, Construction of HT tower/Poles foundations
• Control Room building
• Water reservoir & HDPE overhead tank, Switchyard fencing, Boundary fencing, Security kiosks, Roads, Vehicle parking area
• Plumbing and sewerage lines including septic tank
You or your organization has been identified as a key stakeholder in this project. May you please assist Green Resources Company to identify potential environmental, social, economic and health impacts and suggest mitigation or enhancement measures for the proposed project by participating in the stakeholder consultation process through the questionnaire?
1. What positive (environmental, social, economic or biophysical) impacts do you think about this project?
____________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
2. (a) What negative (environmental, social, economic or biophysical) impacts do you think about this project?
___________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
(b) How do you think these negative impacts can be mitigated?
____________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Location: ________________________________________
Contact: R. Katsidzira
0777 469 266
[email protected]
[email protected]