20/07/2026
Today we finished our installation at Margate on the Redcliffe peninsula at this beautiful old Queenslander.
Installed on the top floor we have a high static 10kw reverse cycle Fujitsu ducted system with air touch controls, fully zoned.
Installed on the ground floor we have a 7.1kw reverse cycle Fujitsu wall split.
Thank Gerard 👌