Stilcon Industrial Services

Call Website Contact the business

Stilcon Industrial Services SIS sets a new standard of excellence across Australia,
delivering comprehensive, top-tier industrial solutions with
unmatched precision and reliability.

We cater to a broad spectrum of needs within the infrastructure, commercial, and industrial sectors.

At SIS, line marking sits within the same team that handles surface preparation and protective coatings. That means the ...
01/11/2026

At SIS, line marking sits within the same team that handles surface preparation and protective coatings. That means the crew applying the lines understands what's underneath them. The team checks substrate condition, moisture, cleanliness, and cure times before setting out a single line, because a marking is only as durable as the surface it's bonded to.

Where the specification calls for it, products such as Dulux Roadmaster are applied to the manufacturer's requirements, and set out is completed to the project drawings so the final layout matches what was designed.

Night works are well underway on one of our major projects this year, with our crews continuing to deliver critical scaf...
28/10/2026

Night works are well underway on one of our major projects this year, with our crews continuing to deliver critical scaffold works across multiple shifts. Night work calls for strong supervision. Site conditions change, work fronts move and coordination with other trades needs to remain clear from one shift to the next. Our supervisors are on the ground with our crews, planning the work, managing changing conditions, and ensuring everyone understands what needs to happen before work begins.

This consistency across every shift keeps the work moving safely and the programme on track. Our crews and supervisors deliver a strong effort night after night. 👷‍♀️

SIS has announced the arrival of its Pilosio IXI Truss beams for the Eastern Freeway Upgrades, part of Victoria’s Big Bu...
26/10/2026

SIS has announced the arrival of its Pilosio IXI Truss beams for the Eastern Freeway Upgrades, part of Victoria’s Big Build. The freeway widening cut through the shared path at Eram Park, so a temporary extension of the Eram Road walking and cycling bridge was needed to keep pedestrians and cyclists moving. That extension had to span a deep excavation and a service road running alongside live freeway traffic. Building a deck in place over the void would have kept crews working at height for days.

Rosslyn, SIS’s in house Design Engineer Lead spent months testing a system with Pilosio that made a different approach possible. Using IXI Truss, which comes in 3 m aluminium sections joined by hand, the team assembled two spans of 21 m and 16 m flat on the ground. At around 13 tonnes each, the spans were light enough for the site's crane to lift.

We fitted temporary handrails before each span left the ground, and checked sling loads against the truss chord capacity. The team then set each span onto Layher towers in a single lift. Not one bay of deck was built out over the excavation.

This is one of the first projects of its kind in Australia, and one we’ll carry with us as a company. Seeing months of design and testing come together over live freeway traffic was a proud moment for everyone at SIS, from our engineering and project teams to the crews on site.

A well deserved shoutout to Vinnie, our Operations Supervisor, who was recently recognised by the team at Western Treatm...
21/10/2026

A well deserved shoutout to Vinnie, our Operations Supervisor, who was recently recognised by the team at Western Treatment Plant for demonstrating the value of caring.

For those who work alongside Vinnie, this recognition comes as no surprise. He takes real pride in his work, looks out for the people around him and brings that same attitude to site every day.

Recognition like this means a lot because it comes from the people who see that contribution firsthand.

Great work, Vinnie. We’re proud to have you on the SIS team 👏

A 16 metre stretcher stair purpose built to provide access from a roof pe*******on through to the base of the ramp area ...
18/10/2026

A 16 metre stretcher stair purpose built to provide access from a roof pe*******on through to the base of the ramp area below. Spanning an active works zone with no mid span support, the structure also allows for suspension via additional head gear, giving the project flexibility as site conditions evolve.

We're proud to add the Western Treatment Plant to our growing portfolio.This significant project involves scaffold works...
15/10/2026

We're proud to add the Western Treatment Plant to our growing portfolio.This significant project involves scaffold works to extend handrails up to 2 metre across approximately 300m, providing safe access for critical electrical and maintenance tasks, including:

🔵 Junction box replacement
⚪ Cable cover access
🔵 Bird nest removal and wiring repairs

The scope includes a suspended Layher scaffold alongside Kwikstage access scaffold, engineered to deliver safe, efficient access across the site.

Scaffolding is where most people know us, but surface treatment and protective coatings sit alongside it as core capabil...
11/10/2026

Scaffolding is where most people know us, but surface treatment and protective coatings sit alongside it as core capability and abrasive blasting is where that work starts. Our workshop provides a controlled environment for structural steel and fabricated components, with containment, consistent ambient conditions, and no weather delays. Where the structure cannot come to us, our mobile blast equipment brings the same capability to the site, working to the same standards and containment obligations.

The work is delivered by blasters and coatings applicators who have spent years reading steel and knowing what a surface needs before a nozzle is ever picked up. They understand profile, they understand containment, and they understand what happens downstream when preparation is rushed. That experience is what keeps the finish consistent from the first component to the last.

👷‍♀️ Project update.South Australia, this one hits a bit differently. The Thebarton Theatre isn’t just another job for u...
08/10/2026

👷‍♀️ Project update.

South Australia, this one hits a bit differently. The Thebarton Theatre isn’t just another job for us. It’s one of those places people here have a story about. Gigs, nights out and memories.

As works move ahead, we’ve put in place an access solution to support the remediation works inside and out, using the Scafom RUX system to handle the tighter, more complex areas of the building.

🔧 What’s happening on site
• Internal birdcage scaffold built in two stages to work around the space
• Plywood laid throughout to protect the existing floors and keep movement safe
• Perimeter scaffold set up for the external works
• Mobile towers used where access is tight and constantly changing
• Load carefully managed to suit the original timber flooring
• Scaffold shaped to the building itself, working around the quirks and protecting the plaster and finishes

Working inside a building like this takes a bit more patience. Everything is thought through, so the structure is protected while the works continue. And just as important as the work itself is who’s delivering it. This job is being carried out with local South Australian crews. Proud to be part of bringing this place back to life!

Our team recently delivered a complex temporary access solution incorporating a covered scaffold bridge, stretcher stair...
05/10/2026

Our team recently delivered a complex temporary access solution incorporating a covered scaffold bridge, stretcher stair access and full encapsulation. The bridge section carries an approximate 10 tonne dead load and is supported by four steel beams. The bridge section was designed to be craned into position and integrated with the supporting scaffold structure, with several critical considerations that were required before the lift took place.

The structure was designed to accommodate a 10 kPa protection load across the upper deck, while the supporting scaffold required carefully considered bracing, connections, buttress bays and counterweight systems to manage the loads transferred through the structure.

Full shrinkwrap encapsulation across the bridge and stairs added another layer to the temporary works design. Once encapsulated, wind actions become a significant consideration, meaning stability, bracing and counterweight requirements needed to be incorporated into the engineering from the outset.

The result was an engineered temporary access solution that provided protected access, while maintaining the required clearance beneath the bridge.

Crack injection is one of the remediation capabilities delivered by SIS, providing a targeted solution to seal cracks, c...
01/10/2026

Crack injection is one of the remediation capabilities delivered by SIS, providing a targeted solution to seal cracks, control water ingress and help restore the integrity of concrete structures. Our team uses specialist injection equipment to introduce repair material directly into the crack, reaching areas that surface treatments alone cannot address.

The injection was run under a controlled pressure at the pump, with the crew reading the gauge and watching the adjacent ports for return. The process allows us to target the source of the issue, restore integrity and help prevent further water ingress and deterioration, extending the service life of the structure.

Address

134-140 Fairbairn Road
Sunshine, VIC
3020

Alerts

Be the first to know and let us send you an email when Stilcon Industrial Services posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Stilcon Industrial Services:

Shortcuts

Share

Nearby engineering companies