A fiberglass install runs in weeks, not seasons.
Here’s the path, end to end: site review, permits, excavation, crane day, equipment and startup, pool school and handover. Six ordered phases, one accountable team, a known crane day.
The shell ships factory-built — gelcoat cured, skimmer and returns set, ports in. A 40-ton crane moves it from the truck to the hole. The site work around it is scoped to your yard: backyard access, soil and grade, coping and deck, partner schedule.
No two timelines are identical. That’s why every Okeanos build starts with a site review, so the dates we lock are dates we can hold.
Plan your timeline with us — link in bio for a quote, or DM and we’ll start the site review.