Cambria Gold Mines

Cambria Gold Mines Responsibly advancing the high-grade Premier Mine on Nisgaโ€™a lands in BC's Golden Triangle ๐Ÿ‡จ๐Ÿ‡ฆ $CAMB.V ๐Ÿ‡บ๐Ÿ‡ฒ $AOTVF
Formerly Ascot Resources.

06/09/2026

News Explained ๐Ÿ“ฐ Cambriaโ€™s CEO Rob McLeod explains the context and significance of the first underground drill results from our infill drill program at the Premier Gold Project, which includes intervals of 19.82 g/t gold over 5.0 meters and 483.0 g/t gold over 1 meter.

Read the full news release here ๐Ÿ”— https://cambriagold.com/news/

$CAMB $CAMVF

NEWS RELEASE | June 9, 2026 | Cambria Gold Mines reports the first results from our 2026 Premier Underground infill dril...
06/09/2026

NEWS RELEASE | June 9, 2026 | Cambria Gold Mines reports the first results from our 2026 Premier Underground infill drill program, including exceptional intercepts of 19.82 g/t gold over 5.0 meters and 483.0 g/t gold over 1.0 meter at Prew Zone.

Read the full news release here ๐Ÿ”— https://cambriagold.com/news/

$CAMB.V $CAMVF

Red Mountain is the highest-grade, bulk-mineable undeveloped gold mine in Canada. The access road between this deposit a...
06/08/2026

Red Mountain is the highest-grade, bulk-mineable undeveloped gold mine in Canada. The access road between this deposit and the Premier Mill is the critical path to production and construction is now underway!

Cambria's Director of Construction is targeting Q1 2028 for road completion. Once it is built, mineralized material from Red Mountain will be transported to the Premier Mill for processing, providing the high-grade, high-volume ore feed that the mill's economics require.

Learn more in our latest News Release ๐Ÿ”— https://tinyurl.com/drdt76er

$CAMB.V $CAMVF

06/06/2026

This week, we reached a major project milestone by starting construction of the Red Mountain access road, a critical step to resuming production at the Premier Mine.

Nick Stoneberger, Director of Construction at Cambria Gold Mines, is a mechanical engineer with over 20 years of experience on construction and mining projects across Canada, the US, Central America, and South America. His mandate: deliver a high-quality project safely, on time, and on budget.

Nick covers the biggest challenge on the project, the Red Mountain access road, and the team assembled to overcome it. He discusses the Q1 2028 target for road completion, the ore transport options being evaluated, and a significant strategic opportunity: the potential for open pit mining at the Big Missouri deposits to enable earlier milling at the Premier Mine.

Learn more about the road construction in our latest news release ๐Ÿ”— https://tinyurl.com/drdt76er

$CAMB $CAMVF

NEWS RELEASE | June 3, 2026 | Cambria Gold Mines has appointed Mr. David Thomas as Vice President Projects (USA) and Ms....
06/03/2026

NEWS RELEASE | June 3, 2026 | Cambria Gold Mines has appointed Mr. David Thomas as Vice President Projects (USA) and Ms. Orla Abrahams as Community Relations Coordinator (USA) for our Mt. Margaret copper-gold porphyry project in Washington State.
Read the full release here ๐Ÿ”— https://cambriagold.com/news/

$CAMB.V $CAMVF

Beautiful weather to start the construction of Cambria Gold Mines access road to the high-grade Red Mountain gold deposi...
06/02/2026

Beautiful weather to start the construction of Cambria Gold Mines access road to the high-grade Red Mountain gold deposit, located in BC's Golden Triangle
$CAMB.V $CAMVF

06/01/2026

News Explained ๐Ÿ“ฐ Cambria CEO Rob McLeod explains the context and significance of the start of construction of the Red Mountain access road ๐Ÿ”— https://cambriagold.com/news/

$CAMB $CAMVF

NEWS RELEASE | June 1, 2026 | Cambria Gold Mines is pleased to announce that construction has commenced on early works o...
06/01/2026

NEWS RELEASE | June 1, 2026 | Cambria Gold Mines is pleased to announce that construction has commenced on early works on the access road with the purpose of developing the high-grade Red Mountain Gold Deposit located northeast of Stewart, BC ๐Ÿ”— https://cambriagold.com/news/
$CAMB.V $CAMVF

05/31/2026

June is Indigenous History Month and we're launching our newest logo, created by Nisga'a artist Kari Morgan K'alaajex. Based in Terrace, BC, on traditional Tsimshian territory, Kari is a Sculptor, Painter, and Designer who aims to display the strengths of her culture and people through her art, and entice positive narrative change.

The Wolf and the Raven represent two of the four major crests of the Nisgaโ€™a people. Kari says, "Shapes can be seen in any of the mountain landscapes, and are often a source of inspiration for designs. When looking at the original Cambria Logo it was easy for me to see the image of both the Wolf and Raven heads intertwined."

We are deeply grateful to Kari for her beautiful work and we are proud to incorporate this piece into our identity.

Nisga'a drum song courtesy of Nisgaโ€™a Lisims Government

05/28/2026

WATCH Cambria CEO Rob McLeod provide a detailed update on our Premier Gold Project and Red Mountain deposit in BC's Golden Triangle, and the next steps for our Mt. Margaret Cu-Au porphyry deposit in Washington. See the full interview here ๐Ÿ”— https://youtu.be/5bBvrECc2xs?si=PYtX9wY4hBi55toy
$CAMB.V $CAMVF

Address

Suite 3123 โ€“ 595 Burrard Street
Vancouver, BC
V7X1J1

Alerts

Be the first to know and let us send you an email when Cambria Gold Mines posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Cambria Gold Mines:

Share

Category