07/15/2026
⛏️ Did You Know?
Before a mining project can move forward, years of detailed work, research, and planning take place behind the scenes.
For the Donlin Gold Project, this work includes:
🪨 Drill programs to collect rock samples from below the surface and help geologists understand the size, shape, and characteristics of the deposit
🔬 Laboratory analysis to examine drill core samples and determine mineral content, gold grades, and geological characteristics
🗺️ Geological studies to understand how the deposit formed and how mineralization is distributed
⚙️ Metallurgical studies to evaluate how gold can be responsibly recovered from the ore
🏗️ Engineering studies to evaluate mine design, infrastructure, power, transportation, and project planning
🌿 Environmental studies to understand ecosystems, establish baseline conditions, and support responsible development planning
💧 Water studies and monitoring to evaluate surface water, groundwater, and aquatic environments
🦅 Wildlife and habitat studies to better understand local species and seasonal patterns
🌎 Geotechnical and geochemical studies to understand rock stability and site conditions
📜 Federal and State permitting to ensure the project meets regulatory requirements for environmental protection, safety, and responsible development
🤝 Community engagement, including collaboration with the Alaska Native Landowners – Calista Corporation and The Kuskokwim Corporation (TKC) to incorporate local knowledge, priorities, and cultural values
📊 Economic and technical evaluations to assess project viability and support informed decision-making
Each sample collected, study completed, and data point analyzed helps build a more complete understanding of the Donlin Gold Project.
Responsible resource development begins long before construction—with science, collaboration, and careful planning.