✨ SKE BIM 4D Design in Practice|Jingdezhen Brewery Project
📌 Project Overview: 50,000 KL/year output · 30 KL brewhouse · 32 fermenters (8×60KL + 24×120KL) · 8×60KL bright b**r tanks · two 18,000 containers/hour filling lines (glass bottle & can).
In the brewhouse, steam, drainage, fire protection and process equipment are tightly interconnected. Traditional 2D drawings can't coordinate space, sequencing and materials at once—so clashes, material mismatches and delays are likely.
SKE's BIM 4D overlays schedule and material flow onto the 3D model:
🔹 4D Schedule & Material Simulation — The model is linked to construction schedules and BOMs, visually showing the arrival, hoisting and installation sequence of tanks, pumps, valves and pipework. Material delivery, storage and cross-construction conflicts are identified in advance.
🔹 Clash Detection — Process equipment, structures and MEP systems live in one model; clashes between piping, tanks and structures are flagged early, minimizing on-site rework.
🔹 One Model, Full Lifecycle — Supports quantity estimation, design reviews, construction coordination, material management and future maintenance planning.
4D BIM isn't just visualization—it integrates space, time and material supply to control construction risk at the source.