04/09/2026
Job no 44
We recently completed the construction of this extension, taking the project from the initial footings right through to full wall height, ready for the roof structure to be installed. The works included setting out and excavating the foundations, laying the footings, constructing the brickwork and blockwork, forming the openings and installing the necessary lintels, with all walls built up to the required level. The extension is now structurally ready for the next stage of works, with the roof installation to follow.
ACW Installations
P and J Group
Job location Cambridge