15/07/2026
unit installed at hugget 👌
We leveled up the hill side with a bit of cut and fill dug and poured the foundations installed bolt based then shutterd and pumped in 14m3 of c40 with structural fibers 150mm thick with powerfloat finish not over worked flat with a smooth surface 👍 cut cleaned and handed over
B D Cowan Groundworks Ltd for all your groundwork’s needs ☎️
Wattsmix
W. Clifford Watts Ltd.