Koi Pond Construction

Koi Pond Construction Specialists in building quality koi ponds. Fibreglass lining, dry goods and maintenance. Also fibreglass flat roofing services

Taken down the old outer wall that was cracked and rebuilt it, should last another 20yrs now!
07/09/2018

Taken down the old outer wall that was cracked and rebuilt it, should last another 20yrs now!

Another leaking waterfall has been repaired, fibreglassed and flow coated to ensure it will last another 25yrs!For furth...
12/07/2018

Another leaking waterfall has been repaired, fibreglassed and flow coated to ensure it will last another 25yrs!

For further fibreglassing services please contact me.

Finally the latest Pond is now complete.This has been a bit of a challenge, going in to complete someone else’s work is ...
30/05/2018

Finally the latest Pond is now complete.

This has been a bit of a challenge, going in to complete someone else’s work is always a worry, however after several problems, the Pond is finally ready for water.

We stripped off existing render, re laid the base, dealt with water ingress, raised it a couple of courses, angled the corners, laid coping with brick on edge finish and supplied and installed the new filter, UVC, pump etc etc.

Oh and before anyone comments, we didnt lay any of the engineering bricks, that was the quality of the work previously!!😝

We built this bespoke pergola today over a customers existing pond and it looks fantastic.All timber is pressure treated...
06/04/2018

We built this bespoke pergola today over a customers existing pond and it looks fantastic.

All timber is pressure treated so it will last for years.
The Pond also has a greenhouse shading so the fish have protection from the sun.

Another satisfied customer!

A new oldschool addition to a customers garden today with this brick BBQ, hopefully we will be invited back in the summe...
23/03/2018

A new oldschool addition to a customers garden today with this brick BBQ, hopefully we will be invited back in the summer!

Completed the overhaul flowcoating of the fishing boat I’ve been working on, sides and engine covers all re painted and ...
11/10/2017

Completed the overhaul flowcoating of the fishing boat I’ve been working on, sides and engine covers all re painted and now looking fresh and clean.

Finished a non slip flowcoat deck today on a fishing boat, looks nice now.Will be found the sides in white soon to give ...
04/10/2017

Finished a non slip flowcoat deck today on a fishing boat, looks nice now.

Will be found the sides in white soon to give it a new makeover.

This was a bit overgrown and needed some tlc.Now looking a lot better.
27/09/2017

This was a bit overgrown and needed some tlc.
Now looking a lot better.

We have fibreglassed many different things for people over the years, not just ponds and roofs, however this boat was a ...
26/09/2017

We have fibreglassed many different things for people over the years, not just ponds and roofs, however this boat was a first.

Re flowcoated a fishing boat and added a non slip deck for when it goes back to sea.

Will be back to do the inner floor and sides soon.

This pond was loosing water for a while, but now having been fibreglassed will last another 25yrs!2 layers of 450g matti...
14/07/2017

This pond was loosing water for a while, but now having been fibreglassed will last another 25yrs!

2 layers of 450g matting and finished in BRG.

If you need a quote for your pond or roof, please contact me.

Slate patio completed today for another satisfied customer and looks lovely.Electrician still needs to fix the slate and...
07/07/2017

Slate patio completed today for another satisfied customer and looks lovely.
Electrician still needs to fix the slate and lighting on the piers but our work is done here.
Pointed in white and brickwork mortar dyed dark grey makes everything stand out.
Enjoy!!

Just finished this pond off for our customer.The hole was dug but left for a long period and most of the sides caved in ...
14/06/2017

Just finished this pond off for our customer.
The hole was dug but left for a long period and most of the sides caved in and corners were lost so they were re build in metal sheeting.
Concreted the shelves and sanded the walls smooth before underlay and liner were fitted.
Now it looks like it should and everyone is very happy with the end result.

Address

Leighton Buzzard
LU7

Alerts

Be the first to know and let us send you an email when Koi Pond Construction posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Share