05/11/2026
Another one wrapped up and we're delighted with how it turned out. 😃
We recently completed a brand new bin storage compound at St Luke's Hospital in Armagh for CHC Group Ltd. The job involved a fresh concrete base, a full drainage channel to keep the area clean and water free, and a solid timber enclosure built on concrete posts for strength and a long life.
From bare ground to a tidy, purpose built compound that keeps the site neat and the bins out of sight. A great space that will stand the test of time.
Thanks to CHC Group Ltd for trusting us with the project. 👍
From groundworks and drainage to concrete, kerbing and general building, we cover the whole of Northern Ireland, fully insured with fast turnaround on quotes.
Looking something similar for your site? Get in touch:
📞 Allen 07886 541339 or Richard 07515 641411
✉️ [email protected]
🌐 ddicksoncontracts.com