06/08/2026
Part 1 of an open-plan rear extension we’re building in Twickenham.
The roof was stripped right back to the rafters, the structural steel went in, and the new roof is now taking shape.
Getting the materials lifted in by crane was a bit of an operation on a residential street, but everything went smoothly.
Part 2 once the roof is watertight.
Planning something similar in Twickenham or around TW1? Send us a message and we’ll talk you through what’s involved.