NG Tunnelling

NG Tunnelling đź’§Thames Water Approved Sewer Connections Contractor Family Run Organisation, Specialising in the Installation of Sewer Connections in and around London

29/04/2026

Reliable and experienced open cut gang required for long term work in London.

Must have: Streetworks ticket, Confined Space ticket, Machine ticket, CSCS, UK driving Licence. Contact Peter on 07738 299726 or DM for further details.

New year, new gear. Keeping the team warm and visible on-site. 👷‍♂️❄️
08/01/2026

New year, new gear. Keeping the team warm and visible on-site. 👷‍♂️❄️

We’re officially charged up and ready for everything 2026 has in store. Let’s go! 🚀Before we dive into 2026, we’re takin...
07/01/2026

We’re officially charged up and ready for everything 2026 has in store. Let’s go! 🚀

Before we dive into 2026, we’re taking a moment to reflect on our success in 2025 and share some snippets of the incredible energy at our end-of-year celebration. It was the perfect chance to take a breath, celebrate our wins, and enjoy the company of the people who make the magic happen every day!

Here’s to 2026! 🤝

​

30/09/2025

We require a fully qualified and experienced heading gang (3-man gang) to work for our family run company, based in London, with a lot of upcoming and long-term permanent work in London and the surrounding counties.

The following tickets are essential:

CSCS Experienced (Blue/Gold card)
Streetworks
Confined Space (Medium/High Risk)
Medical Fit to Work
SSSTS
CPCS Machine Driver with lifting Ops
Slinger/lift Supervisor CPCS
Right to work/valid passport
Valid driving license

Would be beneficial if you have it: Temporary Works Supervisor cert

Please DM for more information.

Farnham Road, Slough Project A 25m long timber heading driven underneath a busy highway to connect to an existing Thames...
19/01/2024

Farnham Road, Slough Project

A 25m long timber heading driven underneath a busy highway to connect to an existing Thames Water manhole.

NG Tunnelling have recently completed the foul and storm sewer connections for a new retirement village scheme in Berkha...
25/11/2023

NG Tunnelling have recently completed the foul and storm sewer connections for a new retirement village scheme in Berkhamsted. 230m of deep open cut drainage, 30m of timber headings and construction of 4no manholes were carried out within the highway.

NG Tunnelling liaised closely with the local council due to the traffic sensitive location and close proximity to a school. Strict timelines were adhered to in order to carry out the works around the school holiday term. All pedestrian and traffic management were arranged including temporary traffic lights and a road closure.

Works were inspected and signed off with Thames Water upon completion.

Well done to our onsite supervisor and operatives.

Microsoft Data Centre, Bashley Road Project – Foul and Storm Sewer Connections NG Tunnelling were contracted to carry ou...
07/10/2023

Microsoft Data Centre, Bashley Road Project – Foul and Storm Sewer Connections

NG Tunnelling were contracted to carry out sewer connections via shafts and timber headings at the Microsoft data centre campus in North Acton.

The connections were made into existing Thames Water manholes approximately 4m beneath the carriageway, and new manholes constructed onsite. Due to the nature of the project, rigorous and controlled standards were adhered to throughout the works.

Following successful completion of the works, NG Tunnelling have been engaged to carry out a further two sewer connections towards the end of 2023.


Sewer Connection Works in Maida Vale:• A slightly longer shaft than usual, at 2.5m distance, was excavated onsite to mak...
13/04/2023

Sewer Connection Works in Maida Vale:

• A slightly longer shaft than usual, at 2.5m distance, was excavated onsite to make allowance for an interceptor trap and manhole

• A timber heading was driven to Thames Water’s culvert, and a flexible saddle connection was core drilled, in line with Thames Water’s requirements.

The works were part of Westminster Council’s redevelopment of the Torridon House Estate car park to construct 21 new homes.

Hallsville Quarter Development, Canning Town – Foul Sewer Replacement An 18m long timber heading to replace an old foul ...
02/02/2023

Hallsville Quarter Development, Canning Town – Foul Sewer Replacement

An 18m long timber heading to replace an old foul sewer line. A new 225mm pipe run was installed to site

Deptford Timber Yard ProjectA 5.5m deep shaft was excavated on site with trench sheets and pump out frames. A 10m long t...
01/11/2022

Deptford Timber Yard Project

A 5.5m deep shaft was excavated on site with trench sheets and pump out frames. A 10m long timber heading was then driven to the main sewer to connect 2no 225mm pipes. Due to the small diameter of the existing main, a large pipe could not be installed, hence our proposal to connect two pipes to achieve adequate capacity for the new drainage installation.

Address

London
CR44NA

Opening Hours

Monday 8am - 5pm
Tuesday 8am - 5pm
Wednesday 8am - 5pm
Thursday 8am - 5pm
Friday 8am - 5pm
Saturday 8am - 1pm

Telephone

+442086486644

Alerts

Be the first to know and let us send you an email when NG Tunnelling posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to NG Tunnelling:

Featured

Share