Reinforcement Detailing Practice – Column Starter Bars (BS 8666)Prepared a Bar Bending Schedule (BBS) for column starter...
12/03/2026

Reinforcement Detailing Practice – Column Starter Bars (BS 8666)

Prepared a Bar Bending Schedule (BBS) for column starter bars connected with different footing types.

Key elements included:
• Bar mark identification
• Footing references (NF1, F1, F3, F4 etc.)
• Lap length calculations
• Development length (Ld)
• Cut length and total steel quantity

All reinforcement detailing follows BS 8666 shape codes, ensuring accurate fabrication and clear instructions for site teams.

Practicing these schedules improves precision in quantity take-off and reinforcement detailing for UK construction projects.

Lap Bars BBS – Ground BeamsPrepared a reinforcement lap schedule following typical UK practice.Standard bar length consi...
04/03/2026

Lap Bars BBS – Ground Beams

Prepared a reinforcement lap schedule following typical UK practice.
Standard bar length considered 12 m, with lap length 40d for Y16 bars.

The BBS includes:
• Required bar length
• Number of bars in beam
• Lap calculation
• Cut length
• Total reinforcement length
• Unit weight and total weight

Accurate lap scheduling helps ensure proper material estimation and efficient reinforcement placement on site.

— AUB Construction Costing Ltd

Stirrups BBS detailed in accordance with BS8666 shape code 51, including 135° double hooks and accurate cutting length c...
03/03/2026

Stirrups BBS detailed in accordance with BS8666 shape code 51, including 135° double hooks and accurate cutting length calculations (24d).

Proper application of shape codes ensures consistency between design, fabrication, and site ex*****on reducing errors and steel wastage.

Precision in detailing = precision in cost control.

Hanger Bars BBS – Ground Beams (BS 8666)Detailed hanger bar BBS prepared for ground beams in full compliance with BS 866...
02/03/2026

Hanger Bars BBS – Ground Beams (BS 8666)

Detailed hanger bar BBS prepared for ground beams in full compliance with BS 8666, covering diagonal legs, middle horizontal length, quantities, and steel weights accurate, buildable, and ready for site use.

Prepared full Footings BBS today based on issued drawings, using centreline dimensions in accordance with BS 8666. Clean...
21/02/2026

Prepared full Footings BBS today based on issued drawings, using centreline dimensions in accordance with BS 8666. Clean, auditable take-offs ready for ex*****on.

Pad footing take-offs completed from structural drawings. Today, I’ll be sharing the full Bar Bending Schedule (BBS) for...
18/02/2026

Pad footing take-offs completed from structural drawings. Today, I’ll be sharing the full Bar Bending Schedule (BBS) for the footings with detailed reinforcement breakdowns.

Pad footing formwork take-off prepared from structural drawings. All dimensions converted from ft/in to metres, measurin...
18/02/2026

Pad footing formwork take-off prepared from structural drawings. All dimensions converted from ft/in to metres, measuring vertical sides only, with no working space allowance.

PCC blinding take-off prepared from structural drawings, measured to footing plan dimensions with 100 mm (0.10 m) thickn...
18/02/2026

PCC blinding take-off prepared from structural drawings, measured to footing plan dimensions with 100 mm (0.10 m) thickness as specified. Quantities calculated in Excel; no working space included.

Footing excavation quantities measured to formation level with PCC blinding from drawings and 150 mm working space allow...
18/02/2026

Footing excavation quantities measured to formation level with PCC blinding from drawings and 150 mm working space allowed where not specified. Dimensions converted from ft/in to metres and calculated in Excel.

Pad footing take-off prepared from detailed structural drawings. All dimensions were converted from ft/inches to metres ...
18/02/2026

Pad footing take-off prepared from detailed structural drawings. All dimensions were converted from ft/inches to metres and measured in Excel to produce accurate concrete quantities. Figures shown are real and drawing-based.

16/02/2026

“Next QS project coming soon, showcasing BOQs, BBs, and comprehensive QS services based on real figures.”

We’re pleased to share our company website, showcasing our Quantity Surveying and cost management services delivered in ...
16/02/2026

We’re pleased to share our company website, showcasing our Quantity Surveying and cost management services delivered in line with UK construction practice.

https://www.aubconstructioncostingltd.co.uk/

Professional quantity surveying and construction cost consultancy across the UK and Middle East. Specialists in cost estimation, BOQs, tender analysis, feasibility studies and project cost control.

Address

47 Creighton Avenue, Newham
London
E63DT

Alerts

Be the first to know and let us send you an email when AUB Construction Costing Ltd posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to AUB Construction Costing Ltd:

Featured

Share