14/08/2026
Recent install of a Worcester 7000WP 50KW on a low level frame feeding two Megaflo Eco’s with immersion back up. Additionally to this, all new low level and high level ventilation was installed and a new gas proving system.
Flue liner and adaptations made by flue systems.
A nice transformation to a small space.
INSTALL | MAINTAIN | REPAIR