Link365

Link365 ᴡᴇ ᴘʀᴏᴠɪᴅᴇ ᴄᴏᴍᴘʟᴇᴛᴇ ᴍᴇᴄʜᴀɴɪᴄᴀʟ, ᴇʟᴇᴄᴛʀɪᴄᴀʟ ᴀɴᴅ ʀᴇɴᴇᴡᴀʙʟᴇ ᴇɴᴇʀɢʏ ꜱᴏʟᴜᴛɪᴏɴꜱ.

It was great to welcome our Portugal team to the 55 West Ealing project for a site visit, alongside our Operations Direc...
01/09/2026

It was great to welcome our Portugal team to the 55 West Ealing project for a site visit, alongside our Operations Director and Project Manager.

As much of the Portugal team is office-based, the visit was a valuable opportunity to see one of our live projects first-hand, gain a better understanding of the work taking place on site and see how plans and coordination come together in practice.

A productive site visit and a great opportunity to bring our teams together and experience the project beyond the office.

Indirect heat interface unit (HIU) should be maintained annually in accordance with EN 806-5 standards. Both systems nee...
27/08/2026

Indirect heat interface unit (HIU) should be maintained annually in accordance with EN 806-5 standards. Both systems need to be maintained: the primary system of the HIU itself and the secondary system being the radiators, showers and cylinders. The steps include:

- Visual check for leaks
- Check for possible active errors on the user interface and force a reset
- Test the correct operation of the pump
- Clean the strainers
- Check the expansion vessel pre-charge value and restore pressure value if
needed, then restore secondary circuit pressure
- Check safety relief valve is dry and that the drain is unobstructed
- Check for internal leaks through the modulating valves
- Check correct setting of the DHW and heating temperature set points
- Check the DHW flow rate at the correct temperature is sufficient

Ask us about our maintenance services which cover all mechanical engineering solutions for buildings https://link365.co.uk/aftercare-and-maintenance-services/

Ever wondered what sits above the ceiling?Before the ceilings are installed, this is where the engineering happens.The p...
21/08/2026

Ever wondered what sits above the ceiling?

Before the ceilings are installed, this is where the engineering happens.

The pipework and fan coil units shown here will work together to provide efficient heating and cooling throughout the building, helping create a comfortable indoor environment for future occupants.

Every installation is carefully planned to ensure reliability, efficiency and ease of maintenance.

Embracing modern methods of construction in the UK, our ventilation specialists are pre-fabricating ductwork ahead of in...
20/08/2026

Embracing modern methods of construction in the UK, our ventilation specialists are pre-fabricating ductwork ahead of installation ensuring everything is prepared and ready for seamless integration on site.

By insulating the ductwork at the workbench prior to installation, the team improves efficiency, enhances quality control, and delivers greater precision throughout the process.

This approach supports faster, safer, and more consistent project delivery.

Did you know? That a Commercial sprinkler systems provide more than fire suppression. By activating early in a fire, the...
19/08/2026

Did you know? That a Commercial sprinkler systems provide more than fire suppression. By activating early in a fire, they control the heat release rate, limit temperature rise, and reduce the generation and spread of smoke. This mitigates fire growth, protects structural integrity, and supports safe egress.

This image captures progress on our Lower Essex project.

Designed and maintained correctly, sprinkler systems are essential for meeting UK fire safety regulations and creating safer, more resilient buildings.

Net Zero is about more than reducing carbon, it's about creating buildings that perform better for people and the enviro...
18/08/2026

Net Zero is about more than reducing carbon, it's about creating buildings that perform better for people and the environment. 🌍

According to the Passivhaus Trust, better Net Zero buildings focus on reducing energy demand, improving indoor comfort, supporting healthier living spaces, and delivering long-term performance, not just meeting carbon targets on paper.

At Link365, we're proud to support projects that contribute to a more sustainable built environment.

📖 Read the full Passivhaus Trust article to learn more. https://passivhaus.uk/better-net-zero-buildings/

Progress is built one connection at a time.Every stage of an MEP installation requires precision, planning and teamwork....
17/08/2026

Progress is built one connection at a time.

Every stage of an MEP installation requires precision, planning and teamwork. Here, our engineer is continuing the rooftop pipework installation as the heating system comes together at our 55 West Ealing project.

Visit our website to view more progress https://link365.co.uk/55-west-ealing/

Progress Update in APEX 1 ProjectSignificant progress continues on the APEX 1 development with Galliard Homes.Recent wor...
14/08/2026

Progress Update in APEX 1 Project

Significant progress continues on the APEX 1 development with Galliard Homes.

Recent works showcase the precise coordination of the Soil Vent Pipe (SVP) and sprinkler pipework installations within a shared riser zone. The integration demonstrates excellent planning, alignment, and attention to detail, resulting in a clean and efficient mechanical layout.

We’re proud to see APEX 1 evolving into a well-coordinated, sustainable, and future-ready building system.

Visit this link for more updates about the project https://loom.ly/mgSyUmo

What are you looking at?This rooftop installation features Mitsubishi air source heat pumps connected to the building's ...
13/08/2026

What are you looking at?

This rooftop installation features Mitsubishi air source heat pumps connected to the building's heating system through insulated pipework.

Here's another progress update from our 55 West Ealing project as the rooftop installation continues to come together. 👷

At our Lower Essex Street Project, a cold water tank system was installed consisting of a storage tank, a booster set, a...
12/08/2026

At our Lower Essex Street Project, a cold water tank system was installed consisting of a storage tank, a booster set, and a home booster, such as those from Grundfos.

The tank provides a buffer supply, helping to stabilise flow when incoming mains pressure is variable. The booster set then increases and regulates system pressure using controlled pumps to meet demand. A home booster unit, installed downstream, compensates for pressure losses within the pipework and ensures consistent delivery at outlets.

Together, these components maintain a steady and reliable water pressure throughout the system.

Visit our website for more information : https://link365.co.uk/lower-essex/

Address

Suite 314, Sterling House, Langston Road
Loughton
IG103TS

Opening Hours

Monday 8am - 5pm
Tuesday 8am - 5pm
Wednesday 8am - 5pm
Thursday 8am - 5pm
Friday 8am - 5pm

Alerts

Be the first to know and let us send you an email when Link365 posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Shortcuts

Share