No job is outside our remit.
This 30-foot feature column at Building 10, Princess Parade, Liverpool Waters had been badly water stained following repairs to the glazed roof above.
The decorating itself wasn’t the biggest challenge… getting to it was.
Positioned between two lift shafts, inside a live reception with glass partitions and constant tenant access, the project required detailed planning, bespoke scaffold design and strict Health & Safety procedures before work could even begin.
The result? A fully restored feature column with minimal disruption to the building and its occupants.
It’s projects like these that show what Griffin Installations is all about—finding solutions where others see obstacles.
Thinking outside the box. Delivering inside it.