Wastewater Treatment Works | Tunbridge Wells, Kent
Two things that made a difference on this project: precise digital formwork design and thorough pre-assembly before anything reached the site.
External and internal TOP50 Large Area Formwork units were modelled separately in Revit, combined into a single family, and rotated around the structure. This ensured high efficiency with the TOP50 system and superior quality in terms of Finish.
Pre-assembly was completed at our Sheffield Branch, so the site team received the components ready for installation.
Delivering complex concrete structures starts long before the pour.
From detailed digital planning to off-site pre-assembly, this project shows how preparation drives efficiency, quality, and smoother installation on site.