Wastewater Treatment Works | Tunbridge Wells, KentTwo things that made a difference on this project: precise digital for...
21/05/2026

Wastewater Treatment Works | Tunbridge Wells, Kent

Two things that made a difference on this project: precise digital formwork design and thorough pre-assembly before anything reached the site.

External and internal TOP50 Large Area Formwork units were modelled separately in Revit, combined into a single family, and rotated around the structure. This ensured high efficiency with the TOP50 system and superior quality in terms of Finish.

Pre-assembly was completed at our Sheffield Branch, so the site team received the components ready for installation.

Delivering complex concrete structures starts long before the pour.

From detailed digital planning to off-site pre-assembly, this project shows how preparation drives efficiency, quality, and smoother installation on site.

Get in touch to see how Doka can support your next infrastructure project.

https://www.doka.com/uk/index

Doka Tunnel Traveller No.2 – SL1 + TOP100Using a double SL1 Traveller with the TOP100 formwork system, we delivered 10 p...
29/04/2026

Doka Tunnel Traveller No.2 – SL1 + TOP100

Using a double SL1 Traveller with the TOP100 formwork system, we delivered 10 pours on 7.5m high walls, achieving an average pour length of 22.5m.

This project demanded an efficient, track-mounted solution capable of casting full-height walls for self-compacting concrete. Leveraging Doka’s global expertise, we engineered a system that not only met these requirements but performed with outstanding efficiency.

Powered by our electric Drive Units TL, the traveller advanced smoothly along the tunnel tracks, ensuring precision, safety, and consistent progress throughout.

Another complex tunnelling project delivered with a focus on performance, efficiency, and engineering precision.

Last week, we welcomed the team from Byrne Bros to our Sittingbourne branch for a hands-on DokaXdek demonstration, plus ...
23/04/2026

Last week, we welcomed the team from Byrne Bros to our Sittingbourne branch for a hands-on DokaXdek demonstration, plus a chance to get up close with some of our other systems.

There's no better way to find the right formwork solution than experiencing it firsthand.

If your team is weighing up options for an upcoming project, we'd love to arrange a branch visit. Get in touch to find out more. 👇

https://www.doka.com/uk/about/contact/form

Doka SKE50+ Climbing System – Chobham Project, StratfordA great project underway in Stratford with our valued customer, ...
15/04/2026

Doka SKE50+ Climbing System – Chobham Project, Stratford

A great project underway in Stratford with our valued customer, Duffy Construction.

The scheme features two core structures with 320m² of Framax formwork in operation, using our automated SKE50+ climbing system, a solution that lifts all external platforms in a single operation, maximising efficiency and safety on every cycle.

Health and safety is central to how this rig operates. The structure remains fully enclosed throughout, with internal platforms raised sequentially to allow rebar installation in a safe, controlled, and productive environment.

The cores are climbing at an impressive rate, a testament to the SKE50+ system itself, and to the quality, coordination, and professionalism of the Duffy site team. The right system, applied correctly, really does deliver.

Well done to everyone involved.

🏆 Shortlisted at the NCE Bridge Awards 2026Doka UK recognised in the Bridge Supplier of the Year categoryWe're proud to ...
14/04/2026

🏆 Shortlisted at the NCE Bridge Awards 2026

Doka UK recognised in the Bridge Supplier of the Year category

We're proud to announce that Doka UK has been shortlisted for the NCE Bridge Awards 2026, with our UniKit system nominated in the Bridge Supplier of the Year category.

UniKit is Doka's modular heavy-load shoring system, engineered for the demands of bridge and civil infrastructure construction, with plug-and-play assembly and load capacities up to 1,000 kN per leg.

We're looking forward to the awards. In the meantime, if you'd like to find out what UniKit could do on your next project, get in touch with our Business Development Manager, Joe McBride.

📩 [email protected]

Learn More - https://www.doka.com/en/system-groups/doka-load-bearing-systems/shoring-towers/uniKit/index

Doka Staxo + Top50 table units used for aerodynamic slabs.Rail infrastructure demands precision. Here's how we delivered...
08/04/2026

Doka Staxo + Top50 table units used for aerodynamic slabs.

Rail infrastructure demands precision. Here's how we delivered it.

Doka UK recently supported a major UK project, supplying Top50 large-area formwork panels and Staxo shoring to form the aerodynamic slabs, a critical structural element at the tunnel portal designed to manage pressure generated by trains entering the tunnel.

Top50's adaptability to complex geometries and Staxo's reliable load-bearing performance made both systems ideally suited to the precision and programme demands of this structure, where tolerances and efficiency are critical.

400 homes. Three towers. One slab formwork system that had never been used at this scale in the UK before. 💪 At the Dyec...
02/04/2026

400 homes. Three towers. One slab formwork system that had never been used at this scale in the UK before. 💪

At the Dyecoats regeneration scheme in Leeds, a brownfield development overlooking the River Aire, Cidon Group specified our next-generation DokaXdek system for Block 2B, alongside Dokamatic table systems for the remaining towers. The Latimer Group led the project in partnership with principal contractor GRAHAM Group

The results spoke for themselves: consistent slab cycles of 8–9 working days across 1,300m² pours, with full-edge tables incorporating permanent cantilever-mounted edge protection, removing the need for traditional beam-and-plywood perimeter solutions entirely.

DokaXdek's flexible swivel heads, hanging beam accessories, and lightweight anti-uplift panels gave Cidon's teams the speed, safety, and adaptability to handle blade columns, façade step-ins, and changing column grids with confidence.

As Con O'Shea, Operations Manager at Cidon, put it: the system delivered on both safety and speed, and they'd use it again without hesitation.

Transforming former industrial land into sustainable communities. That's what good formwork engineering enables.

🔗 Read the full project story here https://www.doka.com/uk/news/press/DokaXdek_Dyecoats_Leeds



https://youtu.be/VH9NuGlA6ik

Doka supplied a complete floor slab formwork solution for Dyecoats, a major £100m housing regeneration scheme in Leeds. Specified by Cidon Construction, the ...

Concrete professionals - we'll see you in Birmingham. 👊Doka UK is exhibiting at the UK Concrete Show, Stand B50 on 25–26...
11/03/2026

Concrete professionals - we'll see you in Birmingham. 👊

Doka UK is exhibiting at the UK Concrete Show, Stand B50 on 25–26 March at the NEC.

On show:
✅ DokaXact
✅ Concremote
✅ Frami & Framax
✅ Plywood & Components
🔥 Live demo: Intelligent Heated Formwork with DokaXdek panels

Come see us, ask us anything, and watch the tech in action.

📍 Stand B50 | NEC Birmingham
📅 25–26 March

09/03/2026

Sweden’s longest escalator on a 30-degree incline is taking shape. 🏗️

As part of the expansion of the Stockholm metro by Region Stockholm, the new Nacka Station is taking shape - including Sweden’s longest escalator, approximately 100 metres long with a vertical difference of 41 metres.

For the construction of the escalator shaft Doka designed an SL-1 Tunnel traveller combined with Doka UniKit to enable precise forming even on a 30-degree incline. The pre-assembled 80-tonne Tunnel traveller was assembled horizontally outside the tunnel before it was positioned at the desired angle and lowered. 🚀

The video below shows the exact project workflow - demonstrating that when it really matters, our solutions make it work. More about the project also on our website 👇:
https://doka.pulse.ly/eqdk86cvdj

Another successful tunnel project delivered!We completed 23 pours (each at 13m pour lengths) on 10m-high walls using our...
27/01/2026

Another successful tunnel project delivered!

We completed 23 pours (each at 13m pour lengths) on 10m-high walls using our SL1 Traveller and TOP100 formwork systems.

This project required an efficient, track‑mounted solution capable of casting full-height walls designed for self‑compacting concrete. Thanks to Doka global expertise, we engineered a system that not only met these requirements but operated with impressive efficiency - powered by our electric Drive Unit TL to smoothly advance along the tracks inside the tunnel.

A fantastic and challenging project to be part of!

www.doka.com/uk

Address

Unit 4, Eurolink V
Sittingbourne
ME103NH

Opening Hours

Monday 8am - 5pm
Tuesday 8am - 5pm
Wednesday 8am - 5pm
Thursday 8am - 5pm
Friday 8am - 5pm

Telephone

+441622749050

Alerts

Be the first to know and let us send you an email when Doka UK posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Doka UK:

Share