Aroha Escapes

Aroha Escapes Modular Buildings I Garden Rooms I New Builds I Extensions

We created Aroha Escapes in 2014 initially to create bespoke garden rooms and since then we have grown and developed our portfolio of designs to include a massive 3 sectional garden room 16 metres x 5 metres! Having a background in house building and home extensions, our garden rooms can be built to the same U-Value specification as new-build houses for all year round use or un-insulated, single-g

lazed for summer use. It's all about personal choice and our team are there to advice you and guide you to the garden room you desire.

What’s behind the external cladding is what really matters. 👌Every connection point is carefully designed and engineered...
30/05/2026

What’s behind the external cladding is what really matters. 👌

Every connection point is carefully designed and engineered to ensure strength, precision, and long-term performance once modules are installed on site.

This image captures one small part of a much bigger process — where planning, accuracy, and skilled workmanship come together to create high-quality modular buildings built to last.

Modern modular construction isn’t just about speed. It’s about delivering reliable, efficient spaces without compromising on quality.

Built with precision. Installed with confidence. 🏗️

Groundworks are a crucial part of any modular build — and they’re completed long before our units arrive on site.As part...
29/05/2026

Groundworks are a crucial part of any modular build — and they’re completed long before our units arrive on site.

As part of our full turnkey service, we can take care of:
✔️ Groundworks
✔️ Running all services
✔️ Septic tank installation
✔️ Foundations and concrete pillars ready for install day

On this particular project, the services and concrete pillars were installed and prepared ahead of delivery by the client, allowing our modular unit installation to run smoothly and efficiently.

Preparation is everything when it comes to modular construction — the better the groundwork, the faster and more seamless the install. 🚧🏗️

Carpets are down 👌If you walked into this space, would you believe it started as two separate units that had never been ...
27/05/2026

Carpets are down 👌

If you walked into this space, would you believe it started as two separate units that had never been connected before or lifted through the air, transported up the bypass, and seamlessly joined together on site?

This is where quality craftsmanship, teamwork, and precision joinery come together.

Walking through what will soon become a busy office space for the RAF gives us a real sense of pride in what can be achieved through modular construction.

Efficient, high-quality, and built with precision from start to finish.

If you’re considering off-site construction for your next project, get in touch with our team to discuss your modular build.

Office: 01294 601954
Email: [email protected]

When we say over 90% of a modular building is completed off-site, we really do mean it.By the time these modules arrive ...
24/05/2026

When we say over 90% of a modular building is completed off-site, we really do mean it.

By the time these modules arrive on site, the vast majority of the work is already done in our controlled factory environment. As you can see from the photos, the internal walls, painting, windows, first fix services, and major construction work are already complete before the lift even takes place.

At this stage, we’re expecting the flooring installer, electrician final fix, plumbing connections, and the painter completing the third and final coat of paint before handover.

This is one of the biggest advantages of modular construction — reduced time on site, improved quality control, fewer weather delays, and a far more efficient build program overall. While traditional builds can spend months exposed to the elements, modular allows us to complete the majority of the project in a controlled environment with precision and consistency from start to finish.

Modern construction. Smarter delivery. Better efficiency.

Months of preparation come together in moments like this.Two modular units being carefully lifted into position as part ...
22/05/2026

Months of preparation come together in moments like this.

Two modular units being carefully lifted into position as part of a larger 6-module project we’re delivering — a great example of why preparation is everything in modular construction.

Every stage has to be planned long before the crane arrives on site. From the steel frame and structural engineering, to transport logistics, foundations, service connections, and precision manufacturing — modular building only works when every detail is considered from the start.

The result is a faster, more efficient build process with less disruption on site, improved quality control, and a building that comes together with precision.

What people often see is the lift day. What they don’t always see are the weeks of design, coordination, manufacturing, and teamwork behind it that make installation run smoothly.

This is the real strength of modular construction — controlled preparation, efficient delivery, and high-quality buildings built to last.

Built from steel. Built to last.This is the beginning of one of our modular units — and it all starts with the frame.The...
20/05/2026

Built from steel. Built to last.

This is the beginning of one of our modular units — and it all starts with the frame.

The strength of any modular building comes from the quality of its structure. Every steel section, connection, and brace has a job to do, creating a building that can withstand transport, lifting, installation, and years of daily use once in place.

Modular construction only works when it’s done properly. Precision engineering, strong materials, and attention to detail at every stage are what separate a temporary structure from a permanent, high-quality building.

That’s why we take pride in building modular units the right way from the ground up — creating strong, reliable spaces designed for the long term, not just for delivery day.

Six modules. One complete building. Built with strength at its core.

Big things are built from small details.These custom powder coated steel box clamps, engineered by Russell  , are a perf...
18/05/2026

Big things are built from small details.

These custom powder coated steel box clamps, engineered by Russell , are a perfect example of the creativity and problem-solving that goes into modular construction. Designed to securely bring our modular buildings together on-site, they might look simple — but the detail, and craftsmanship behind them make all the difference.

What makes projects like this work is the collaboration behind them. Local businesses bringing their expertise together, sharing ideas, and creating practical solutions that improve quality, efficiency, and durability on every build.

What a day. What an effort from the team. 🌞👷Phase 1 has now been delivered to Prestwick Airport for our large modular bu...
16/05/2026

What a day. What an effort from the team. 🌞👷

Phase 1 has now been delivered to Prestwick Airport for our large modular build project which will consist of 6 modular units in total. Phase 1 was the first 3 units transported skilfully by the team at 3B.

As we complete over 90% of our modular builds in the workshop the final subcontractor works will now be carried out on-site while our team continues progressing the remaining 3 units in production.

At this point I want to express my thanks to the whole team at Aroha Escapes as this has been a monumental project to take on at such a tight schedule where the guys have worked tirelessly to get us to this point and successfully deliver the first 3 units.

Another busy week in the workshop for our largest modular project yet. Everyone has been hard at it early mornings and w...
05/05/2026

Another busy week in the workshop for our largest modular project yet.

Everyone has been hard at it early mornings and weekends to get the units delivered on time.

The first three units are scheduled for delivery late next week, at which point all external work will be complete, with internal finishing touches, electrical, plumbing, flooring and painting to be finalized on site.

Following from the initial placement of the first three units, we will proceed to the next phase, focusing on the subsequent three units to form a single, cohesive large unit.

The final build will be home to 2 x large office areas, managers office, kitchenette, 3 x toilets, sitting area and a vestibule.

Busy week this week hard landscaping and adding an a large extension to a garden room we completed over 8 years ago.  Th...
28/02/2026

Busy week this week hard landscaping and adding an a large extension to a garden room we completed over 8 years ago. The garden room has been well used over the years and enjoyed by the customers family but now its time to add more space.

The beauty of using Cedral cladding is there is very little wear in the cladding over the years so when the new extension is added on it will look like the room was built in one.

The Landscaping is an exciting design we will show off in a couple of weeks.

Thank you our returning customers for the opportunity to work on this exciting project.

Address

Stevenston

Alerts

Be the first to know and let us send you an email when Aroha Escapes posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Aroha Escapes:

Share