Topland Construction LTD

Topland Construction LTD CIVIL ENGINEERING AND GROUNDWORKS CONTRACTOR,
SPECIALIZING IN EARTHWORKS, ROADS AND SEWERS.

🤩There’s always a first for everything 🤩Both dozers were on the move the same time and the same day at the start of the ...
08/07/2026

🤩There’s always a first for everything 🤩
Both dozers were on the move the same time and the same day at the start of the week 👌

A nice start on an external corner of a screening bund in Warminster, while other machines have been busy getting 750mm ...
06/06/2026

A nice start on an external corner of a screening bund in Warminster, while other machines have been busy getting 750mm deep 6f5 pile mats finished last week ready for piling. All the machines on GPS making such easy work of it all 👌🤩👌

🤩 A great finish to these commercial units in Swindon back at the start of April 🤩 Over 18 months from a green farmers f...
03/06/2026

🤩 A great finish to these commercial units in Swindon back at the start of April 🤩 Over 18 months from a green farmers field to these 4 buildings, split into 19 units and 3 court yards. They really do look good finished 👌🤩👌

🤩The OG Transit🤩been there’s since day 1 over 9 and half years ago and still going strong.The van that made us stick to ...
22/05/2026

🤩The OG Transit🤩been there’s since day 1 over 9 and half years ago and still going strong.
The van that made us stick to black for the whole van fleet since 👌
Out delivering materials to Witney today. 1.2T weight in the back and still pulls like a train 🚂 💪

👌The best way to lay 120T of tarmac in the site carpark ? Create a surface model on the gps and get it spot on👌Topsoil s...
14/05/2026

👌The best way to lay 120T of tarmac in the site carpark ? Create a surface model on the gps and get it spot on👌
Topsoil strip started for swales and pond on another phase at the same time 🤩

🤩Another refurbishment project on going over the last 6 weeks in Telford 🤩New internal drainage cut out and reinstated.R...
13/05/2026

🤩Another refurbishment project on going over the last 6 weeks in Telford 🤩
New internal drainage cut out and reinstated.
Replacement of car park kerbing.
Block paving remedials to car park.
Break out old concrete ramps and aco channels and replace with a new 50m run of aco’s and huge new concrete apron along most of the building length.
Looking good with 100m3 of new concrete slab poured today 💪👌

31/03/2026

🤩Nothing like watching the dozer level stone from the eye in the sky🤩

🤩 Been a good start in Warminster with topsoil strip and stockpile, released roads cut and capped. Plots cut to formatio...
24/03/2026

🤩 Been a good start in Warminster with topsoil strip and stockpile, released roads cut and capped. Plots cut to formation for foundations and pile mats to commence 🤩👌

💥 BOOMS UP FRIDAY 💥 All lined up ready to get going next week with topsoil strip and road cut all on GPS 💪
13/02/2026

💥 BOOMS UP FRIDAY 💥 All lined up ready to get going next week with topsoil strip and road cut all on GPS 💪

🧐Google earth photos of work still progressing in Basingstoke. Pump station with holding tank and rising main in to take...
12/02/2026

🧐Google earth photos of work still progressing in Basingstoke. Pump station with holding tank and rising main in to take all future phases. More roads cut and drainage installed over the last few months. 👌

Address

Darby Close
Swindon Village
SN22PN

Opening Hours

Monday 7am - 6pm
Tuesday 7am - 6pm
Wednesday 7am - 6pm
Thursday 7am - 6pm
Friday 7am - 6pm
Saturday 7am - 6pm

Telephone

+447795547662

Website

Alerts

Be the first to know and let us send you an email when Topland Construction LTD posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Topland Construction LTD:

Shortcuts

Share