Liquid Applied Membranes

Call Directions Website Contact the business

Liquid Applied Membranes Specialist Waterproofing and Industry Safe Linings and Coatings. GRP Fibreglass Lining and Roofing Services. Experts in Cold Liquid Applied Membranes.

We are based in Pembury, Kent but work throughout the UK. Liquid Applied Membranes (LAM) was founded in 2009 by Director Mark Richards. Mark has over 30 years’ experience in waterproofing and surfacing industries and has managed many prestigious commercial and domestic projects throughout the UK. Mark’s tenacious attitude can add value to any project along with his wealth of project management expertise whilst his eye for detail and efficiency ensure all services are carried out on time and on budget. Liquid Applied Membranes deliver proven solutions to fulfil a wide range of applications. Our systems deliver the highest levels of technical performance. We offer all of our customers both commercial and domestic the highest levels of support and service in satisfying their specific needs. We pride ourselves on our customer service which results in high customer satisfaction and repeat business. Liquid Applied Membranes operates within the commercial, industrial and domestic sectors. We work with our clients in the most efficient and cost effective way throughout their projects. LAM can add value to any project by tailoring value engineering solutions to help the client save on cost whilst maximising performance. LAM is responsible for sales, estimating, design and installation. Liquid Applied Membranes is committed to building long term relations based on integrity, performance, value and client satisfaction. We are a dedicated team striving to bring our customers the best possible service we can.

The GRP wall lining system at this specialist facility in Loughborough for main contractor PJ Hegarty is now fully compl...
03/11/2026

The GRP wall lining system at this specialist facility in Loughborough for main contractor PJ Hegarty is now fully complete — and the results speak for themselves.

Every surface has been expertly prepared, laminated and finished to deliver the seamless, hygienic and hard‑wearing environment this type of facility demands. Our GRP lining system continues to be the go‑to choice for laboratory and testing manufacturers !

A brilliant installation from start to finish — another quality job delivered by the LAM team. We’re proud to share that we were also awarded Best Contractor on the project, recognising our organisation, professionalism and unwavering commitment to high‑level health and safety standards.

We’ve recently got cracking with the GRP wall lining system to the newly constructed blockwork at a facility in Loughbor...
30/10/2026

We’ve recently got cracking with the GRP wall lining system to the newly constructed blockwork at a facility in Loughborough for main contractor PJ Hegarty. The team has ensured every surface is prepared and installed to the standard these environments demand.

Our GRP lining system was the perfect solution for this type of specialist facility. More and more leading laboratory and testing manufacturers are choosing GRP because it offers:

• Seamless, hygienic surfaces — no joints, no weak points, and no areas for bacteria to harbour

• Exceptional chemical resistance — ideal for spaces exposed to cleaning agents, testing processes, and controlled environments

• Durability under heavy use — GRP withstands impact, moisture, and daily operational wear

• Easy maintenance — smooth, non‑porous surfaces make cleaning fast and reliable

• Long-term performance — a fully bonded system that protects the structure for years

This installation is already shaping up brilliantly, and we’re looking forward to sharing more progress as the project continues.

Another quality job underway by the LAM team.

Teepol Tank & Chemical Bund Lining — Project Case StudyOur team recently completed a full GRP lining installation to the...
28/10/2026

Teepol Tank & Chemical Bund Lining — Project Case Study

Our team recently completed a full GRP lining installation to the Teepol tank and chemical bund area at British Gypsum, Kirkby Thore — transforming a heavily corroded, rust‑affected space into a safe, durable and fully protected environment.

The client needed a long‑term solution for a rusted chemical bund that could withstand harsh chemicals and regular engineer foot traffic. After assessing the condition, we recommended our GRP lining system — the ideal choice for corrosion prevention and chemical‑resistant environments.

To prepare the area, the team used Citra Clean Concentrate, a powerful degreaser designed to remove heavy grease and carbon. We then mechanically abraded the surfaces to remove rust and loose material, creating a strong key for the GRP adhesion.

Once prepared, we installed a seamless GRP lining, giving the factory a clean, tidy and fully protected finish. The new bund area is built to withstand factory conditions, chemical exposure and daily foot traffic — ensuring long‑term safety and durability.

The client was extremely happy with the transformation.
Another quality installation delivered by the LAM team.

That’s a wrap at the water treatment works in Darenth — the overlay system is now fully installed and looking spot on.On...
22/10/2026

That’s a wrap at the water treatment works in Darenth — the overlay system is now fully installed and looking spot on.

Once the prep and detailing were finished, the PU liquid installation went down smoothly, giving us those crisp, satisfying results we always aim for. Attention to detail is what makes these systems perform, and the team have delivered another quality finish from start to end.

Our latest Kensington transformation is all set! What was once a redundant coal store is now a fully functional cold wat...
19/10/2026

Our latest Kensington transformation is all set! What was once a redundant coal store is now a fully functional cold water storage tank, tailored for this unique cottage conversion project. We used a 5410 resin layup system for the installation, ensuring a durable and reliable finish that meets the client’s needs. The result is a tank that’s not only efficient but also backed by a 10‑year guarantee, giving the client peace of mind for the long haul.

This project was a real pleasure for the team — in and out with a fantastic outcome.

Our swimming pool steps are officially complete, and we’re excited to share the final results.With the surface carefully...
15/10/2026

Our swimming pool steps are officially complete, and we’re excited to share the final results.

With the surface carefully ground down and the fibreglass layers in place, we’ve topped it off with a smooth, durable finish that’s built to last. For added safety, several of our clients have chosen a non-slip tread option as well, providing an extra layer of protection.

It’s been a straightforward, satisfying project, and we’re looking forward to more like it.

Project update from our work with a leading food manufacturer in Wombourne🚨We’re now down at base level, and the coating...
12/10/2026

Project update from our work with a leading food manufacturer in Wombourne🚨

We’re now down at base level, and the coating is looking fantastic. The client is really pleased with our progress. Our team has been working under strict health and safety regulations throughout, and we’re delighted with the results so far. We’re now prepping the concrete base ready to apply long‑lasting protection and waterproofing. Once the scaffolding comes down and the final base work is complete, this project will be all wrapped up.

We have started a small set of swimming pool steps. We dived straight in by mechanically grinding the surface to ensure ...
08/10/2026

We have started a small set of swimming pool steps. We dived straight in by mechanically grinding the surface to ensure proper adhesion and remove the loose flakey coating underneath. Now, the steps are fully fibreglassed and ready for the final NPG Buefa Swim top coat, perfect for chlorinated pools. Stay tuned for the final look!🏊🏼‍♂️

We’re excited to share that we’ve just started work on two roof areas at a residential property in Pembury, Tunbridge We...
06/10/2026

We’re excited to share that we’ve just started work on two roof areas at a residential property in Pembury, Tunbridge Wells, Kent. Our client opted for a full strip-off, re-deck, and a ResTec Flexitec 2020 installation. The team is currently underway: they’ve stripped the roofs back to the bones and decked them with 18mm OSB3, trimmed everything neatly, and now they’re ready for the ResTec Flexitec 2020 application. Stay tuned to see the fantastic results!

A crisp, clean blue finish that’s officially ready for those last golden rays of sunshine. The transformation is seamles...
30/09/2026

A crisp, clean blue finish that’s officially ready for those last golden rays of sunshine. The transformation is seamless, glossy, and looking absolutely spot‑on. Water delivery lands next week — and we just know the client will be counting down the days until they can have a splash around. Amazing work from the team once again.

Address

Unit 8, Hawkwell Business Centre, Colts Hill
Tunbridge Wells
TN24AG

Opening Hours

Monday 9am - 5pm
Tuesday 9am - 5pm
Wednesday 9am - 5pm
Thursday 9am - 5pm
Friday 9am - 5pm

Telephone

+441892825768

Alerts

Be the first to know and let us send you an email when Liquid Applied Membranes posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Liquid Applied Membranes:

Shortcuts

Share

Nearby engineering companies


Other Industrial Companies in Tunbridge Wells

Show All