20/09/2023
New replacement tarmac footpath carried out for Wyre Piddle parish council.
✅ The existing cracked and damaged tarmac excavated and removed.
✅ New kerbing installed to the correct path formation in a low section which held water.
✅ New tarmac layed utilising the existing kerbs to save costs for the client.
✅ Low grass area raised with top soil and seeded to prevent future water pooling.